Laserfiche WebLink
s� <br />\1 <br />500 0 <br />500 <br />1000 <br />c ; <br />_, 1 <br />SCALE:ft <br />S <br />-mod <br />=� <br />,'_ % <br />Future = <br />o <br />l" µ� <br />EMP -22 <br />, <br />, _ <br />Existing EMP -1 <br />, <br />i <br />�) � G" � 5. P �� � <br />� <br />l <br />Historic Area <br />-; <br />o P 9• Es 1 WHEX --D1 [6) -,� <br />� a <br />MC4E 2 0 � �� 40.9 Acres 46 <br />Q <br />�� - <br />Buffer <br />r ES <br />o�� 35 I 22 cfs 3.2 AF <br />;; <br />,�� <br />� <br />PG <br />-E <br />ass <br />�G� <br />(0P <br />� <br />r <br />O• <br />_ <br />N NG <br />IO J.S y, oo _ <br />- - <br />EMP -09 <br />Q <br />, <br />-- <br />1 A <br />30.4 Acres 38.2 cfs <br />"' � <br />5115 <br />PG C <br />17.6 cfs 2.1 AF <br />PG-F <br />is <br />F <br />F <br />Lo <br />`P <br />P&B <br />zany <br />d <br />NC -B1 <br />-__ N G) <br />C� <br />21.4 <br />Acres <br />34 <br />B129.0 <br />14.3 cfs cfs <br />3.2 AF Tributary to <br />23.1 Acres- cfs NC-B <br />, Ironclad Facility and <br />r, <br />o . cfs . �ai3a <br />f 2 <br />144 0 AF <br />DEN TREES � � <br />Minin Areas <br />9 , <br />!p , =I <br />' EMP -21 <br />r\ <br />hr <br />p <br />Nca <br />NC <br />-A1 <br />11/Z <br />PO -A1 <br />27158 <br />48.2 <br />Acres 56 cfs - <br />, 9.4 Acres 23.4 cfs <br />/i 11.2 cfs 1.9 AF <br />F <br />Jb <br />vo�h <br />a� <br />27 cfs 3.9 AF % <br />N <br />° <br />° <br />0 <br />0004 7N/1 <br />a <br />) <br />w, - y . <br />T ES o <br />Tributary to <br />Squaw VLF Storm <br />N, N � � � \ \ OAK-) <br />� � � , , , _ _ <br />$° Tributary to -'� - <br />I Squaw Gulch <br />Water Mgmt. <br />Area <br />>; F, <br />OSA <br />- <br />0 <br />, <br />e <br />Q <br />Refer to <br />Squaw VLF <br />' Storm Water Plan <br />4000% d,// °- 0 <br />0111I <br />) <br />Basins and Diversion Channels - Existing <br />Conditions and During Mining Development <br />Plan View <br />Legend <br />1 " =500 ft (DSize) <br />Basin Name <br />Area __ jlzcosA-2, 10 e z �t5 Discharge <br />10yr Discharge- a1 cfs 10 AcreFeet 2 x 10yr Volume <br />EFA Channel Name <br />100 -yr Discharge (cfs) <br />10 yr Discharge (cfs) <br />■ ■ i ■ ■ m ■ ■ Temporary or Existing Channel <br />ff■ l if f� l f� l ii ff• Proposed New Channel <br />■ ■ ■ ■ ■ ■ ! ■ Mining Boundary <br />Basin Boundary <br />Alternate <br />Land Use 1 <br />Land Use 2 <br />Land Use 3 <br />I <br />I <br />Pond Size as <br />Receiving EMP <br />i <br />Arithmetic ' <br />Current or <br />( ) <br />Receiving <br />1 <br />_ ? 1 <br />l <br />Average Runoff <br />Design <br />Function of <br />Basin <br />EMP during <br />:'design <br />Total Area <br />CN1 <br />Areal <br />S(in) <br />I Q1 <br />CN2 Area2 S(in) I Q2 <br />CN3 I Area3 I S(in) ! Q3 <br />Volume; Design Criteria <br />1 Volume <br />Basin Area <br />Description <br />1 <br />CN I <br />Mining <br />(Ac -Ft) ! <br />(Ac -Ft) <br />(AF perAcre) <br />3 <br />WHEXA1 <br />EMP018 <br />2.70 1 <br />22.80 <br />66 1 <br />6.8 1 <br />5.15 <br />1 0.41 <br />71 I 14.82 4.08 1 0.59 <br />90 1 1.14 i <br />1.11 1 1.71 <br />70.45 1 1.1 I <br />2.3 <br />0.10 <br />WHEX B1 <br />EMP018 <br />2.70 1 <br />13.60 <br />66 1 <br />4.1 1 <br />5.15 <br />1 0.41 <br />71 8.16 1 4.08 j 0.59 <br />90 1.36 <br />1.11 1 1.71 <br />71 1 0.7 1 <br />1 1.5 <br />0.11 <br />WHEX C1 <br />EMP018 <br />2.70 1 <br />28.50 <br />66 1 <br />28.5 1 <br />5.15 <br />B 0.41 <br />I <br />66 1 1.0 <br />1.9 <br />0.07 <br />WHEX D1 <br />EMP010 Mine <br />2.70 1 <br />40.90 <br />66 1 <br />38.0 <br />5.15 <br />1 0.41 <br />90 1 2.863 1.11 1.71 <br />68 1.7 <br />3.4 <br />0.08 <br />WHEX E1 <br />EMP019 Mine <br />2.70 I <br />105.30 <br />66 1 <br />27.4 <br />5.15 <br />1 0.41 <br />71 :77.922 1 4.08 1 0.59 <br />70 l 4.8 <br />1 9.6 <br />0.09 <br />ECOSA-A1 <br />EMP016 <br />2.70 <br />47.60 <br />66 ! <br />44.7 <br />5.15 <br />I 0.41 <br />90 2.856 1 1.11 1.71 <br />' <br />67 1 1.9 <br />1 3.9 <br />0.08 <br />ECOSA -B1 <br />EMP017 <br />2.70 <br />59.50 <br />71 I <br />59.5 <br />4.08 <br />1 0.59 <br />1 1 <br />j' <br />' i <br />71 1 2.9 III; <br />5.9 <br />0.10 <br />ECOSA-C1 <br />EMP017 <br />2.70 <br />33.60 <br />71 <br />11.8 <br />4.08 <br />1 0.59 <br />50 16.8 1 10.00 0.05 <br />90 5.04 <br />1.11 1 1.71 <br />63 1 1.4 <br />I 2.7 <br />0.08 <br />ECOSA-D1 <br />EMP017 <br />2.70 <br />20.80 <br />71 <br />4.2 <br />4.08 <br />1 0.59 <br />6 <br />66 1 16.64 5.15 1 0.41 <br />I <br />i ; <br />67 1 0.8 1 <br />j 1.5 <br />0.07 <br />ECOSA -E1 <br />EMP020 <br />2.70 <br />110.60 <br />66 <br />104.0 <br />5.15 <br />I 0.41 <br />90 I 6.636 1 1.11 1.71 <br />i <br />I <br />67 4.5 I <br />I 9.0 <br />0.08 <br />EMP -10 Total <br />Removed by WHEX <br />2.70 1 <br />40.90 <br />Ponds are sized for 2 times the 10- yr /24 -hr discharge volume from contributing 1.7 2xv10 <br />3.4 <br />0.08 <br />EMP -016 Total <br />Existing <br />2.70 <br />47.60 <br />1 basins if there's no outlet (terminal structures); or for the 10- yr /24 -hr volume if pond 1 4.8 V1 -Flow Through 4.8 <br />0.10 <br />EMP- 017Total <br />Rebuilt Cameron Ponds <br />2.70 1 <br />113.90 <br />1 3 9.9 2xV10 <br />1 is fitted with pert pipe and volume evacuates to a downstream terminal EMP. Note 1 1 <br />19.7 <br />0.17 <br />EMP -018 Total Above WHEX High Wall - Pumpe <br />2.70 1 <br />64.90 <br />2.8 2xV10 <br />5.7 <br />0.09 <br />1 that the flow from basins may go to different EMP ponds throughout the life of 1 1 <br />EMP -019 Total <br />Removed by WHEX& Rebuilt <br />2.70 1 <br />105.30 <br />I <br />1 7.6 V10- Flow Through <br />7.6 <br />0.07 <br />I <br />1 <br />1 <br />1 mine as whown on the drawing, so these Design Volumes should be considered 1 1 <br />EMP -020 Total <br />Eastof Cameron <br />2.70 1 <br />110.60 <br />1 <br />1 4.5 2xV10 <br />as a guideline for reference purposes. I 1 <br />1 9.0 <br />Avg 0.09 <br />NC -A1 <br />EMP -8a <br />2.70 1 <br />48.20 <br />90 <br />4.8 <br />1.11 <br />1.71 <br />50 1 27.5 1 10.00 1 0.05 <br />90 1 15.9 1.11 1 1.71 <br />67 3.1 <br />6.1 <br />0.13 <br />NC -B1 <br />EMP8a <br />2.70 1 <br />21.40 <br />€ <br />50 <br />1 <br />11.8 <br />10.00 <br />1 <br />1 0.05 <br />90 9.6 1.11 1.71 <br />1 <br />1 <br />68 1.4 <br />1 <br />2.8 <br />0.13 <br />NC -C1 <br />EMP8a <br />2.70 1 <br />15.80 <br />66 <br />7.9 <br />5.15 <br />0.41 <br />j <br />50 7.9 10.00 0.05 <br />I 1 1 <br />58 1 0.3 <br />0.6 <br />0.04 <br />NC -D1 <br />EMP8a <br />2.70 i <br />6.30 <br />66 <br />3.2 <br />5.15 <br />1 0.41 <br />71 1 3.2 4.08 0.59 <br />¢ <br />69 1 0.3 1 <br />0.5 <br />0.08 <br />NC -E1 <br />EMP8a <br />2.70 <br />5.43 <br />66 1 <br />2.7 <br />5.15 <br />0.41 <br />71 1 2.7 3 4.08 1 0.59 <br />1 1 <br />69 I 0.2 1 <br />0.5 <br />5 <br />EMP8a Total <br />Existing Depression Area <br />I <br />91.70 <br />66 1 <br />11.1 i <br />1 <br />i 1 <br />R, 5.3 2xV10 <br />1 10.5 <br />lAvg 0.10 <br />PG -A1 <br />EMP -021 <br />2.70 1 <br />22.40 <br />66 1 <br />11.2 <br />5.15 <br />1 0.41 71 11.2 4.08 1 0.59 69 0.9 <br />1 1.9 <br />0.08 <br />PG-B1 <br />EMP -021 <br />2.70 <br />23.10 <br />66 1 <br />8.1 <br />5.15 <br />1 0.41 71 15.0 4.08 1 0.59 E 1 69 1.0 1 <br />1 2.0 <br />0.09 <br />PG -C1 <br />EMP -009 <br />2.70 1 <br />31.90 <br />66 1 <br />31.9 <br />5.15 <br />0.41 1 d 66 1.1 <br />2.2 <br />0.07 <br />PG-Dl <br />EMP -009 <br />2.70 <br />30.40 <br />66 1 <br />30.4 <br />5.15 <br />1 0.41 1 1 ) 1 66 ! 1.0 <br />2.1 <br />0.07 <br />PG-El <br />EMP -009 <br />2.70 <br />8.60 <br />66 1 <br />8.6 <br />5.15 <br />0.41 1 1 66 1 0.3 <br />1 0.6 <br />0.07 <br />PG -F1 <br />EMP -009 <br />2.70 <br />12.80 <br />66 1 <br />12.8 1 <br />5.15 <br />0.41 ! 1 1 66 1 0.4 <br />0.9 <br />0.07 <br />P G -G 1 <br />EMP -022 <br />E1 <br />2.70 E <br />19.70 <br />66 <br />• <br />19.7 ! <br />5.15 <br />1 0.41 1 € 1 1_ 1 66 € 0.7 <br />5 E 3 <br />1.3 <br />0.07 <br />EMP -22 Total Flow <br />Future - Near End of Mining <br />E <br />1 <br />19.70 <br />1 <br />19.7 <br />3 3 <br />0.7 2 x V1 o <br />1.3 <br />EMP -21 Total Flow <br />Replaces EMP8a <br />I <br />45.50 <br />1 <br />45.5 <br />1 <br />I 2.0 1 2xV10 <br />I 3.9 <br />1 <br />1 <br />Pond Sizes for 2 times the 10- yr /24 -hr discharge volume from contributing basins. ` <br />1 <br />Four Ponds - 3 are removed & <br />i <br />EMP -9 Total Flow <br />replaced <br />2.70 1 <br />83.70 <br />83.7 <br />2.9 1 2xV10 <br />5.7 <br />Avg 0.08 <br />Vindicator <br />VIN -A1 <br />EMP013 <br />2.70 1 <br />57.30 <br />90 1 <br />1.1 1 <br />1.11 <br />1 1.71 <br />50 1 28.7 10.00 1 0.05 <br />66 1 27.5 5.15 1 0.41 <br />58 1 1.2 1 <br />1 2.4 <br />0.04 <br />Land Use <br />- SCS Curve Number Criteria Design Precipitation Depths and <br />Return <br />Calculation of Excess Precipitation for <br />Curve No. <br />Land Use Period Criteria <br />Each Land Use (SCS Method) <br />90 <br />Compacted Roadways and Crestof <br />2 Yr /24 -Hr 1.8 <br />Inches <br />S= Potential Retention (inches) = (1000- 10xCN) /CN <br />Stockpiles <br />Precipitation <br />10 Yr /24 -Hr 2.7 <br />inches <br />Excess Precip (Q in inches) = (P- 02xS)2 /(P- 0.8xS) <br />Depths <br />71 <br />Pre -and Post Reclamation Grassed <br />100 Yr /24-Hr 3.5 <br />inches <br />Runoff from each land use area is independentof <br />Area or Revegetaton <br />others within the same basin because the runoff is <br />66 <br />Post Reclamation Forested, Pre- mining <br />independently collected by channels. Therefore, <br />Natural Areas <br />Excess Precip (runoff) values from each land use are <br />summed to provide the total volume from each basin. <br />50 <br />Overburden Fill Areas Face of Stockpiles <br />The EMP storage volume is based on the sum of the <br />runoff from contributing basins. <br />Summary of Calculated Pond Sizes Based on Land <br />2 )Table <br />Use <br />NO. DATE MADEBY CKD.BY <br />REMARKS <br />Cresson Mine Steffens and <br />Associates, Inc. <br />ZIL 1211/11 SDS <br />Preliminary Issue For Review <br />Water <br />near Victor CO %tettens' <br />Resources - Environmental - Mining Engineering <br />U) <br />0 1/7/12 SIDS ME <br />Added Details and Tables <br />Inc Golden, CO 80403 - 0:303.210.1801 - C:303.378.8181 <br />Z <br />C' <br />0 1/30/2012 SIDS ME/TC <br />Accepted for Use and Distribution <br />MLE2 Storm Water Plan CLIENT: CC$V Gold <br />Mining Co. <br />g <br />8/15/2012 SIDS <br />Added North Annwand Bar Scale <br />; <br />' <br />W <br />Aft. Drawing Number <br />�� -- Poverty Gulch Basins and <br />Scale <br />DRAWING NO. <br />0 <br />- Summary Table Sht 2 of 6 <br />Noted CCV10 -SA <br />