My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-16_REVISION - C1981038
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2012-08-16_REVISION - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:05:18 PM
Creation date
8/17/2012 8:30:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
REVISION
Doc Date
8/16/2012
Doc Name
Letter Application & Public Notice
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
TR54
Email Name
BFB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINE ENGINEERING <br />MINE RECLAMATION <br />August 14, 2012 <br />J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7 STREET, UNIT <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX 242 -7908 <br />Brock Bowles <br />Division of Reclamation, Mining & Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Bowie No. 1 Mine <br />Technical Revision No. 54, <br />Revise channel lining for reclaimed Ditch 7 <br />Permit C- 1981 -038 <br />Dear Mr. Bowles: <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />RECEIVED <br />AUG 16 2012 <br />Division of Reclamation, <br />Mining and Safety <br />On behalf of Bowie Resources, LLC, enclosed is an application for a technical revision to <br />change the design for reclaimed Ditch 7. <br />Ditch 7 was reclaimed in 2008. Riprap was placed, and the surrounding area was topsoiled <br />and seeded. Ditch 7 is currently specified to be plated with 3 -8" riprap. This technical <br />revision will change the lining material for the upper segment of the ditch, and increase the <br />required diameter of riprap in the upper, middle and lower segments of ditch 7. <br />The channel lining in the upper segment of Ditch 7, as shown on attached Figure 1, will be <br />changed to grouted riprap. The grout will be a low strength concrete and the purpose is to <br />fill the voids between the rock in order to anchor the riprap on the steep slope. To the extent <br />possible, the grout will be placed between the rocks, so the roughness (Manning's n) will not <br />change. <br />Supporting documentation follows. <br />No increase in bond required. Ditch 7 is a permanent drainage feature. <br />Sincerely, <br />Tamme Bishop, P.E. <br />Project Engineer <br />cc: Basil Bear <br />Enclosures: <br />Volume 6A: Pages 6a -6e <br />
The URL can be used to link to this page
Your browser does not support the video tag.