My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-08-02_REVISION - M2006010 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2006010
>
2012-08-02_REVISION - M2006010 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:30 PM
Creation date
8/3/2012 3:18:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006010
IBM Index Class Name
REVISION
Doc Date
8/2/2012
Doc Name
RESPONSE
From
DWR
To
DRMS
Type & Sequence
CN1
Email Name
TCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEPARTMENT OF NATURAL RESOURCES <br />DIVISION OF WATER RESOURCES <br />John W. Hickenlooper <br />Governor <br />Mike King <br />n Executive Director <br />l ` Dick Wolfe, P.E. <br />Director /State Engineer <br />Response to Reclamation Permit Conversion Application Consideration <br />DATE: August 2, 2012 <br />TO: T C. Wait, Environmental Protection Specialist RECEivF <br />CC: Division 2 Office; District 18 Water Commissioner <br />FROM: Caleb Foy, E.I.T. C r- F AUG 02 ZOO:' <br />Division of Reclarnai rr <br />RE: Feister Pit, File No. M- 2006 -010 Mining & Safety <br />Operator: Las Animas County <br />Contact: Phil Dorenkamp, (719) 846 -2931 <br />Sec. 28, Twp. 31S, Rng. 68W, Sixth P.M., Las Animas County <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. If stormwater is contained on -site, it must <br />infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br />unless an augmentation plan approved by water court is obtained. <br />COMMENTS: N/A <br />Office of the State Engineer <br />1313 Sherman Street, Suite 818 • Denver, CO 80203 • Phone: 303 - 866 -3581 • Fax: 303 - 866 -3589 <br />http://water.state.co.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.