My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-20_REVISION - C1982057
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982057
>
2012-06-20_REVISION - C1982057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:01:25 PM
Creation date
6/21/2012 12:38:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
REVISION
Doc Date
6/20/2012
Doc Name
Request to Postpone Topsoiling and Seeding
From
DRMS
To
Seneca Coal Company, LLC
Type & Sequence
TR73
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />June 20, 2012 <br />Roy Karo <br />Seneca Coal Company, LLC <br />P.O. Box 670 <br />Hayden CO 81639 <br />RE: Seneca I1W Mine (Permit No. C1982057) <br />Technical Revision No. 73 — Pond 016 Slide Remediation <br />Request to Postpone Topsoiling and Seeding <br />Dear Mr. Karo: <br />The Division has received your request for postponement of topsoil redistribution and seeding of areas of <br />the Seneca I1W Mine affected by the slide remediation work. We agree that the past winter was extremely <br />dry and was not likely a good test of whether the remediation efforts in the Pond 016 slide area were <br />successful. In order to ensure that topsoil resources would not be lost should a subsequent slide occur, it <br />would be best to verify the stability of the area under normal conditions before topsoil is replaced. <br />Therefore, the Division approves your request to delay topsoil replacement and seeding until 2013. Topsoil <br />replacement and seeding must be completed no later than December 31, 2013. In the interim, it is <br />imperative that Seneca Coal Company continue to control noxious weeds on the topsoil stockpile and <br />regraded areas even though final reclamation of the areas will be delayed. <br />The 2011 Rill and Gully Map submitted by Seneca Coal Company indicates that the Pond 016 area drainage <br />and road would be topsoiled. The Division is aware that this will not be done in 2012; the map need not be <br />revised. <br />Should you have questions or need additional information, please contact me. <br />Sincerely, <br />Susan L. Burgmaier <br />Environmental Protection Specialist <br />Office of Office of <br />Mined Land Reclamation <br />STATE OF COLORADO <br />COLORADO <br />D I V I S I O N O F <br />RECLAMATION <br />MINING <br />— &— <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta E. Pineda <br />Director <br />Denver • Grand Junction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.