My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-06-09_REPORT - M1977378 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977378
>
1992-06-09_REPORT - M1977378 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2021 6:42:24 AM
Creation date
6/1/2012 10:59:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REPORT
Doc Date
6/9/1992
Doc Name
Annual Fee/Report/Map
From
Sunnyside Gold Corp
To
MLRD
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Signature: <br />*/4F r RPr <br />Notice of Intent to Continue Mining Operations <br />112 Annual Report UN 9 1992 <br />Permittee Name: S nnyside Gold Corp <br />orp Minedi_ancl <br />Permit No: —77 -378 / v Reclamtinr, <br />Operation Name: Sunnyside Mine ) <br />Anniversary Date: 06/10/92 <br />Total: $430.00 (Due on your Anniversary Date) <br />1. Has your mine been granted TEMPORARY CESSATION STATUS? dES5 NO <br />Does your mine operate MORE or LESS than 180 days per year? MORE C'LESS7 <br />2a. Financial Warranty: $ 1 . 5 mm 2b. Permitted acreage: <br />3. Do you have a phased reclamation plan? NO <br />4. Total acres affected during the report year:* <br />5. Total acres reclaimed for the report year:* <br />6. Total acres in various stages of reclamation:* <br />a. Backfilled: <br />Contact Name: <br />Company: <br />Address: <br />b. Graded: 23.3 <br />C. Seeded: reseeding only <br />List species seeded & seeding <br />rate for report year on back See attached report <br />7. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* See attache report <br />8. Estimated total acres to be affected in the next report year:* 0 <br />9. COMMENTS: See attached report <br />* Please show the location of the acreage for items 4 — 6 on your map * *. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. <br />** NOTE, If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, you must state this fact above. <br />III IIIIIIIIIIIIiiii <br />Date: o <br />1.5 <br />d. Topsoil replaced: <br />Average topsoil thickness <br />replaced: <br />23.3 (in progress) <br />Please type or print current contact name, mailing address, and phone number below: <br />Larry Perino <br />Sunnyside Gold Corporation <br />P.U. Box 177 <br />Silverton, CO 81433 <br />Federal Tax ID No. or Social Security No.: 98- 0071882 <br />Phone: ( 303 ) 387 -5533 <br />
The URL can be used to link to this page
Your browser does not support the video tag.