Laserfiche WebLink
c0I <br />RACE1 :� <br />U.S. DEPT. OF THE INTERIOR esTorii ct <br />OFFICE OF SURFACE MINING MAY 1 1 2 <br />Mine Site Evaluation f ��� <br />State Program ""� <br />Division of Keclan <br />Mining and Saf <br />Permittee/Person <br />(AMERICAN SHIELD COAL CO. <br />2. Address <br />110830 N. CENTRAL EXPRESSW <br />3. City <br />(DALLAS <br />5. Zip Code <br />175231 <br />7. Operator Name, if Different <br />8. Mine Name <br />than Permittee <br />6. Phone Number <br />1(214) 692 <br />4. State <br />ITXI <br />1FRUITA NO. 1 AND 2 <br />9. Permit Number <br />IC 015 - 81 <br />11. Field Visit Date 12. Purpose <br />14/24/2012 <br />14. Permit Status <br />AB3 <br />17. OSM Office # <br />1140 <br />105 -03170 <br />1125973 <br />Io <br />15. Site Status <br />1FR 1 <br />18. CCID # <br />CO <br />10. Permit Type <br />IPP I <br />13. SRA Present <br />I <br />16. Facilit T pe <br />19. Land Code <br />IS <br />20. M.S.H.A. ID # 21. State Abbrev. 22. Coun <br />/Burrough <br />23. AVS Permittee Entity ID Number 24. State Office <br />25. Hours <br />1 4.0 1 <br />1 3.8 <br />1 8.0 1 <br />1 3.0 1 <br />a. Permit Review <br />b. Site Visit Time <br />c. Travel Time <br />d. Report Writing <br />26. Signature Block <br />Christine Belka, ID #182 <br />Date: <br />Signature <br />Printed Name <br />15/1/2012 <br />Permit Type - Item 10 IP = Interim Program PP = Permanent Program NP = No Permit <br />Purpose Type Codes - Item 12 <br />Oxx.. Oversight <br />Axx. Assistance <br />RFx .Reclamation Fees <br />Fxx...Federal Actions <br />Joint Inspection - Item 13 A joint inspection is when a state inspector accompanies an OSM inspector at any time during the review of the mine site <br />Permit Status - Item 14 <br />A Active Coal mining activities occurring or permitted but not yet <br />disturbed. <br />IN Inactive (Permanent Program Permit): Phase II completed or <br />Temporary Cessation of Operations (Interim Program Permit): <br />Coal mining completed and reclamation activities initiated. <br />BR Bond Release. Reclamation completed and State Regulatory <br />Authority(RA) has released all of the bond (Phase III Release) <br />Site Status - Item 15 <br />ND No Disturbance No coal mining and reclamation <br />operations have been started. <br />EX Coal Exploration: Coal exploration operations have <br />started and where coal mining operations have not <br />begun <br />AP Active Coal Producing. Coal surface mining <br />activities are occurring. <br />AN Active Non - Producing Active non - producing facility <br />such as tipple or preparation plant. <br />NM No Mining The Permit Status is active, site is not in <br />Temporary Cessation, no surface coal mining <br />activity, and site not regraded. <br />MC Mining Complete No mining activity on site, site <br />regraded and awaiting bond release <br />TC Temporary Cessation The RA has granted <br />cessation of mining pursuant to 30 CFR <br />816/817:13(b). <br />P1 Phase I Release At least Phase I bond release <br />granted for entire permitted area. For intenm <br />permits, partial bond release. <br />P2 Phase II Releases At least Phase II bond release <br />for the entire permitted area <br />P3 Phase III Release Reclamation completed and <br />the RA has released all bond. <br />NS <br />FP <br />FR <br />FO <br />WC <br />Signature <br />Review Date: I ,(,.a / <br />mm - dd - yyyy <br />Is Supplemental MSE Page Used Y/N <br />CCR. Citizen Complaint Referral (non -site visit <br />CC Citizen Complaint (initial site visit) <br />CCF Assistance <br />AB Abandoned: All surface and underground coal mining activities have ceased and operator <br />has left the site without completing reclamation as defined in 30 CFR 840:11(g). <br />AB1 Bond Forfeiture Bond forfeiture officially in process or completed and reclamation in <br />progress or not yet commenced <br />AB2 Partially Reclaimed Forfeiture: Forfeited site where all bonds have been used to reclaim site, <br />but site not reclaimed to Program standards. <br />AB3 Reclaimed Forfeiture. Forfeited site that has been reclaimed to Program standards <br />NA Not Applicable When site is unpennitted <br />Non -Site Visit: Status of site not determined <br />Forfeiture Pending' The RA is pursuing actions to <br />revoke the permit, collect the performance bond(s), <br />and /or reclamation of forfeited site is in progress. <br />Forfeited and Reclaimed: Forfeiture reclamation <br />completed. <br />Abandoned Site Abandoned site that is permitted but <br />there is no bond <br />Wildcat Coal mining and reclamation operations have <br />or are taking place and the activity is not covered by <br />the required permits from the RA. <br />Facility Type Codes - Item 16 D . Ancillary (Haulroad, Conveyor, and /or Rails H.. Exploration Permits <br />A . Surface E....Refuse and /or Impoundment I ..Notice of Intent to Explore L ...Remining site permitted under 30 CFR 785 25 <br />B ..Underground F .. Loading Facility and /or Tipple J...,Exempt 16 and 2/3 <br />C ...Preparation Plant G....Stockpiles <br />K...Govemment Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments are Important <br />The Small Business and Agnculture Regulatory Enforcement Ombudsman and 10 Regional Faimess Boards were established to receive comments from small businesses about Federal agency <br />enforcement actions The Ombudsman will annually evaluate the enforcement activites and rate each agency's responsiveness to small business If you are a small business (a business with 500 or <br />fewer employees including those of affiliates) and wish to comment on the enforcement or compliance activities of OSM, call 1 -888 -REG -FAIR (1-888 -734- 3247). <br />Page 1 <br />