Laserfiche WebLink
2012 -04 -25 00:02 DRMS 3038328106 » <br />Permit i`# - <br />Total acres <br />backfilled: <br />Total acres <br />graded: <br />Seed <br />application <br />method: <br />5 <br />Ni- <br />Total acres <br />seeded w/ <br />approved mix: <br />Total acres <br />fertilize( w/ <br />apvd fertilizer: <br />Fertilizer <br />application <br />method: <br />Annual Report 1 <br />According to C.R.S. 34-32.5-116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall <br />submit the annual fee, an annual report and map showing the extent of current disturbances to affected land, <br />required monitoring information, reclamation.accomplished to date and during the preceding year, any new <br />disturbance that is anticipated to occur during the upcoming year, any reclamation that will be performed .during <br />the upcoming year, the dates for the beginning of active operations, and the date active operations ceased for the <br />year, if any. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. if, while completing this report, you learn that your site is not in compliance with the rules <br />and the act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. is the site identification sign posted in accordance with Rule 3.1.12(1) ES NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2) <br />3. is the mine site In final reclamation (all material extraction and stockpile removal is complete)7 YES <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1,3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? 26Cj <br />5. Does the mine operate more or less than 180 days per year? <br />Tf "LFSS ", please review Rule 1.13 to assure chat your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining •. incomplete and or unreleased reclamation) <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. 0 <br />10. Estimated new acreage to be affected In the next report year. t <br />11. Estimated acres to be reclaimed in the next report year. V <br />J.L. Total acres in various stages of reclamation, since permitted raining activities began: <br />Total acres <br />w /topsoi I <br />replaced: <br />'Topsoil <br />replacetnent <br />depth_(ln.): <br />�!I <br />Mulch <br />application <br />method: <br />P 4/5 <br />2a9V -azz— <br />Total acres <br />mulched w/ <br />approved mulch: <br />Mulch application <br />rate (tons): <br />YES NO <br />MOR <br />YES <br />YES <br />i <br />0 <br />