Laserfiche WebLink
Hernandez, Alysha <br />From: Binns, Janet <br />Sent: Tuesday, March 13, 2012 9:32 AM <br />To: DRMS- Coal -Admin <br />Subject: New Elk Coal Mine C1981012 <br />Attachments: Temp Load -Out at Coal Yard - Model R.02.pdf <br />C1981012 <br />General Docs <br />Proposed temporary clean coal truck tipple <br />From: Jim Stover [mailto:jestover @bresnan.net] <br />Sent: Monday, March 12, 2012 12:41 PM <br />To: Binns, Janet <br />Subject: FW: Temporary Load -Out and Conveyor Permit needed for Clean Coal Yard Loading. <br />Janet <br />The attached drawing shows some bins and belt lines NECC needs to install. The work is all within the disturbed area <br />boundary. Would this be processed as a TR or MR? <br />Jim Stover <br />J. E. Stover & Associates, Inc. <br />2352 N 7th St Unit B <br />Grand Junction, CO 81501 <br />Phone 970 - 245 -4101 <br />From: Steve Smith [mailto:steve @newelkcoal.com] <br />Sent: Friday, March 09, 2012 5:10 PM <br />To: iestover @bresnan.net <br />Cc: Ron Thompson; Danny Miller; wright @newelkcoal.com; Kyle Krogen; Allen Weaver; Terry Davis <br />Subject: Temporary Load -Out and Conveyor Permit needed for Clean Coal Yard Loading. <br />Jim, <br />The Conceptual Plan Drawing attached is for bidding and permit purposes. The Temporary Load -Out for Truck Loading <br />will consist of a conveyor being fed by Twin Hoppers over feeders. The idea is feed the conveyor to obtain a mix of the <br />two seams of coal we are mining. We would like to get this built as soon as possible. <br />I'm also showing a future conveyor system that will need permitted for the two silos, as well. The conveyor <br />discharge ends will be designed so that both conveyors will dump into the same truck loading hopper. The temporary <br />system can be used until the permanent silo conveyor system is designed and built. Once the permanent silo system is <br />operational, the temporary system will be removed. The silo system will work on the same principle, so that we will <br />store a different coal in each conveyor and mix them as we load the trucks. <br />We will send these projects out to bid as bid - design -build projects, so this drawing is only a concept for what should be <br />engineered and designed. Once we choose a contractor, and the design is finished, we could submit a more detail <br />drawing if needed. We have already received more detailed concept drawings from one contractor on the silo system, <br />showing two different models to choose from. I can forward that information to you if you need it. <br />We would like to start right away on construction for the temporary system, so let me know what you can do on a <br />permit for that. If you need anymore information, please let me know. <br />Thanks, <br />Steve Smith <br />New Elk Coal <br />303 - 300 -8897 <br />