Laserfiche WebLink
REFERENCE: <br />EXISTING GROUND TOPOGRAPHY WAS CREATED BY CON49INING THE <br />=OLLOWINC FILES <br />SQUAW GULCH BASE TOPO - PHASE l.DWG <br />(RECV MARCH 29, 2010 FROM FORESIGHT WEST SURVEYING, <br />INC.) <br />SQUAW GULCH BASE TOPO - PHASE 2.DWG <br />(RECV APRIL 26, 2010 FROM FORESIllilf WEST SURVEYING, <br />INC) <br />SQUAW GULCH BASE TOPO - PHASE 3.DWG <br />(RECV MAY 4, 2010 FROM FORESIGHT 'NEST SURVEYING, <br />09028 -COMOSIFE-TOPO MILE -lMITS.DWG <br />(RECV MAY 28, 2010 FROM CC&V) <br />100 0 100 200 FEET <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR AND EL, FEET <br />(AERIAL SURVEY) <br />EXISTING GROUND SURFACE CONTOUR AND EL, FEET <br />(PROVIDED BY FORESIGHT WEST SURVEYING) <br />PROPOSED GROUND SURFACE CONTOUR AND EL, FEET <br />NOTES: <br />1. TIMBER FROM EXISTING TIMBER WALLS TO BE USED FOR WALL FACING 5. VERTICAL SPACING OF MSE REINFORCEMENTS TO BE DETERMINED BASED <br />CONSTRUCTION. ON INTERNAL STABILITY OF STRUCTURE, WITH A MAXIMUM SPACING OF <br />24 INCHES. <br />2. BASED ON ANTICIPATED WALL LOCATIONS, ONLY OPTIONS FOR SHORED <br />MECHANICALLY-STABILIZED EARTH (SMSE) WALLS ARE SHOWN. <br />EXPOSED COMPETENT BEDROCK WOULD ALSO PROVIDE A SUFFICIENT <br />BACKSLOPE FOR WALL FACING CONSTRUCTION. HOWEVER, CONTRACTOR <br />MAY ELECT TO EXCAVATE SUFFICIENTLY TO PROVIDE FOR CONSTRUCTION <br />OF ONLY ED EARTH (MSE) WALL WITH A <br />LARGER CROSS-SECTIONAL GEOMETRY. <br />3. DETAILS PROVIDED ARE FOR INFORMATIONAL PURPOSES ONLY. <br />CONTRACTOR TO DEVELOP DESIGN SHOP DRAWINGS FOR REVIEW BY <br />ENGINEER FOLLOWING GUIDANCE PROVIDED IN FHWA PUBLICATION <br />NUMBER FHWA-CFL/TD-06-001 (MORRISON ET AL., 2006). <br />4. EMBEDMENT DEPTH (D) FUNCTION OF WALL SLOPE IN FRONT OF WALL, <br />WITH A MINIMUM DEPTH OF 1.6 FT. <br />TREATED PL) <br />1/2' <br />OPTION A <br />NTS <br />RECLAIMED TIMBER <br />CRIBBING <br />(SEE NOTE 1) <br />H <br />FINISHED <br />TIMBER <br />IFORCEMENT, <br />AROUND <br />NAIL STRIP <br />r REINFORCEMENT, <br />WRAPPED AROUND <br />)OD BATTEN STRIP <br />6. REINFORCED FILL TO CONSIST OF FREE-DRAINING SELECT GRANULAR <br />FILL. <br />7. INTERNAL AND EXTERNAL DRAINAGE FOR THE RETAINING WALL IS <br />REQUIRED, WHICH MAY CONSIST OF A DIVERSION CHANNEL ABOVE THE <br />RETAINING WALL, INTERNAL DRAINAGE FOR THE SHORING WALL WITH <br />WEEP HOLES EXITING THE FACE OF THE TIMBER WALL, AND DRAINAGE <br />BELOW AND BEHIND THE MSE REINFORCED FILL (IF POORLY DRAINING <br />BACKFILL IS USED). <br />8. SPECIAL CARE SHALL BE TAKEN IN DESIGN OF CONNECTIONS TO THE <br />TIMBER FACING AND THE SHORING WALL TO CONFIRM THE TENSILE <br />STRENGTH OF THE PROPOSED CONNECTION MEETS OR EXCEEDS THE <br />TENSILE STRENGTH OF THE MSE REINFORCEMENT. <br />OPTION B <br />NTS <br />IN�WnIN <br />MSE REINFORCEMENT TO TIMBER CONNECTION <br />GRADE TO PREVENT <br />SURFACE PONDING <br />MSE <br />REINFORCEMENT <br />TO TIMBER <br />DETAIL 1 <br />CED FILl- <br />tAO VE 6) <br />12" TO 24" <br />(SEE NOTE 5) <br />EXISTING GROUND <br />--"Z <br />SHORING WALL (NOTE 2) <br />NOTE: SHORING WALL REINFORCEMENTS <br />NOT SHOWN FOR CLARITY <br />MSE REINFORCEMENT <br />TO SHORING WALL CONNECTION <br />D <br />F(SEE DETAIL 2) <br />(SEE NOTE 4)(� <br />--MSE REINFORCEMENT <br />'7 - <br />LENGTH = 0.3H MIN. <br />LEVELING PAD <br />TYPICAL CUT WALL WITH TIMBER FACING <br />POTENTIAL TIMBER FACED WALL AREA <br />I ---, FACE OF TIMBER MSE WALL <br />NTS <br />MSE REINFORCEMENT <br />(REMOVE SLACK FROM CONNECTION) <br />GALVANIZED CARRIAGE BOLT <br />SET IN DRILLED HOLE WITH <br />BONDED EPDXY <br />SHOTCRETE SHORING WALL <br />OR ROCK CUT SLOPE <br />VOOD 50mm OR LARGER)_ <br />GALVANIZED STANDAR _ <br />PIPE <br />BODKIN <br />JOINT <br />OPTION A <br />NTS <br />REINFORCEM <br />MSE <br />REINFORCEMENT <br />EXTENDING FROM <br />SHORING WALL FACE <br />SHOTCRETE SHORING WALL <br />OPTION B <br />NTS <br />MSE REINFORCEMENT TO SHORING WALL <br />TIMBER, <br />MOCK CRIB <br />ANCHOR <br />(�B WALL ELEVATION VIEW <br />�A800 NTS <br />EXISTIN <br />-RAIL ROAC <br />< <br />A <br />A800 <br />SA PAD AR <br />IAF <br />Ell <br />A <br />S <br />rl <br />I <br />REFERENCE: <br />EXISTING GROUND TOPOGRAPHY WAS CREATED BY CON49INING THE <br />=OLLOWINC FILES <br />SQUAW GULCH BASE TOPO - PHASE l.DWG <br />(RECV MARCH 29, 2010 FROM FORESIGHT WEST SURVEYING, <br />INC.) <br />SQUAW GULCH BASE TOPO - PHASE 2.DWG <br />(RECV APRIL 26, 2010 FROM FORESIllilf WEST SURVEYING, <br />INC) <br />SQUAW GULCH BASE TOPO - PHASE 3.DWG <br />(RECV MAY 4, 2010 FROM FORESIGHT 'NEST SURVEYING, <br />09028 -COMOSIFE-TOPO MILE -lMITS.DWG <br />(RECV MAY 28, 2010 FROM CC&V) <br />100 0 100 200 FEET <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR AND EL, FEET <br />(AERIAL SURVEY) <br />EXISTING GROUND SURFACE CONTOUR AND EL, FEET <br />(PROVIDED BY FORESIGHT WEST SURVEYING) <br />PROPOSED GROUND SURFACE CONTOUR AND EL, FEET <br />NOTES: <br />1. TIMBER FROM EXISTING TIMBER WALLS TO BE USED FOR WALL FACING 5. VERTICAL SPACING OF MSE REINFORCEMENTS TO BE DETERMINED BASED <br />CONSTRUCTION. ON INTERNAL STABILITY OF STRUCTURE, WITH A MAXIMUM SPACING OF <br />24 INCHES. <br />2. BASED ON ANTICIPATED WALL LOCATIONS, ONLY OPTIONS FOR SHORED <br />MECHANICALLY-STABILIZED EARTH (SMSE) WALLS ARE SHOWN. <br />EXPOSED COMPETENT BEDROCK WOULD ALSO PROVIDE A SUFFICIENT <br />BACKSLOPE FOR WALL FACING CONSTRUCTION. HOWEVER, CONTRACTOR <br />MAY ELECT TO EXCAVATE SUFFICIENTLY TO PROVIDE FOR CONSTRUCTION <br />OF ONLY ED EARTH (MSE) WALL WITH A <br />LARGER CROSS-SECTIONAL GEOMETRY. <br />3. DETAILS PROVIDED ARE FOR INFORMATIONAL PURPOSES ONLY. <br />CONTRACTOR TO DEVELOP DESIGN SHOP DRAWINGS FOR REVIEW BY <br />ENGINEER FOLLOWING GUIDANCE PROVIDED IN FHWA PUBLICATION <br />NUMBER FHWA-CFL/TD-06-001 (MORRISON ET AL., 2006). <br />4. EMBEDMENT DEPTH (D) FUNCTION OF WALL SLOPE IN FRONT OF WALL, <br />WITH A MINIMUM DEPTH OF 1.6 FT. <br />TREATED PL) <br />1/2' <br />OPTION A <br />NTS <br />RECLAIMED TIMBER <br />CRIBBING <br />(SEE NOTE 1) <br />H <br />FINISHED <br />TIMBER <br />IFORCEMENT, <br />AROUND <br />NAIL STRIP <br />r REINFORCEMENT, <br />WRAPPED AROUND <br />)OD BATTEN STRIP <br />6. REINFORCED FILL TO CONSIST OF FREE-DRAINING SELECT GRANULAR <br />FILL. <br />7. INTERNAL AND EXTERNAL DRAINAGE FOR THE RETAINING WALL IS <br />REQUIRED, WHICH MAY CONSIST OF A DIVERSION CHANNEL ABOVE THE <br />RETAINING WALL, INTERNAL DRAINAGE FOR THE SHORING WALL WITH <br />WEEP HOLES EXITING THE FACE OF THE TIMBER WALL, AND DRAINAGE <br />BELOW AND BEHIND THE MSE REINFORCED FILL (IF POORLY DRAINING <br />BACKFILL IS USED). <br />8. SPECIAL CARE SHALL BE TAKEN IN DESIGN OF CONNECTIONS TO THE <br />TIMBER FACING AND THE SHORING WALL TO CONFIRM THE TENSILE <br />STRENGTH OF THE PROPOSED CONNECTION MEETS OR EXCEEDS THE <br />TENSILE STRENGTH OF THE MSE REINFORCEMENT. <br />OPTION B <br />NTS <br />IN�WnIN <br />MSE REINFORCEMENT TO TIMBER CONNECTION <br />GRADE TO PREVENT <br />SURFACE PONDING <br />MSE <br />REINFORCEMENT <br />TO TIMBER <br />DETAIL 1 <br />CED FILl- <br />tAO VE 6) <br />12" TO 24" <br />(SEE NOTE 5) <br />EXISTING GROUND <br />--"Z <br />SHORING WALL (NOTE 2) <br />NOTE: SHORING WALL REINFORCEMENTS <br />NOT SHOWN FOR CLARITY <br />MSE REINFORCEMENT <br />TO SHORING WALL CONNECTION <br />D <br />F(SEE DETAIL 2) <br />(SEE NOTE 4)(� <br />--MSE REINFORCEMENT <br />'7 - <br />LENGTH = 0.3H MIN. <br />LEVELING PAD <br />TYPICAL CUT WALL WITH TIMBER FACING <br />POTENTIAL TIMBER FACED WALL AREA <br />I ---, FACE OF TIMBER MSE WALL <br />NTS <br />MSE REINFORCEMENT <br />(REMOVE SLACK FROM CONNECTION) <br />GALVANIZED CARRIAGE BOLT <br />SET IN DRILLED HOLE WITH <br />BONDED EPDXY <br />SHOTCRETE SHORING WALL <br />OR ROCK CUT SLOPE <br />VOOD 50mm OR LARGER)_ <br />GALVANIZED STANDAR _ <br />PIPE <br />BODKIN <br />JOINT <br />OPTION A <br />NTS <br />REINFORCEM <br />MSE <br />REINFORCEMENT <br />EXTENDING FROM <br />SHORING WALL FACE <br />SHOTCRETE SHORING WALL <br />OPTION B <br />NTS <br />MSE REINFORCEMENT TO SHORING WALL <br />TIMBER, <br />MOCK CRIB <br />ANCHOR <br />(�B WALL ELEVATION VIEW <br />�A800 NTS <br />