Laserfiche WebLink
� EMP 22 Constructed / <br />in 2018 for Service <br />beginning in 2019 f <br />[All within Buffer Boundary] <br />Future <br />EMP -22 <br />A Channel <br />EMP -9- 4 ponds constructed in (2013) / Profile D <br />10AFTotal Capacity Sheet 6 3s <br />EN TP <br />1.20 Acres outside the Historic <br />Buffer boundary - J 0 <br />40 4M j <br />Historic Recreation <br />Buffer Bonn o Channel <br />Channel - �� Profile F ' <br />Profile C 1 Sheet 6 <br />Sheet 6 EMP 09 <br />tu O Q <br />� <br />� 9/23 O 5r11 <br />j N <br />� O o <br />a o e <br />a PCB Channel <br />0 3 1 Lag Profile G <br />ZJ) k c Sheet 6 <br />xcs EMP-Sa <br />r <br />[2013 -161 <br />EMP - -21 )o <br />EMP -21- Constructed <br />in 2014 Total <br />Capacity10AF j <br />n <br />PO-A <br />1111 -/23 <br />11 <br />Channel <br />Profile E EMP �C48 <br />Sheet 6 - <br />I J' , <br />Tributary <br />SG VLF <br />r )Poverty Gulch Storm Water Management Area <br />�. Plan View <br />1 " =500 ft (DSize) <br />Q <br />Tributary <br />to SGOSA <br />Poverty Gulch Storm Water Management Area <br />2 Schematic <br />Consu a <br />Lower South and <br />Upper South Ditches <br />EIVI i� <br />to %P7 <br />6MP-.. <br />r <br />12o.4 ac ' <br />Grade Ditch <br />along Existing Roads <br />Pre and <br />p Existing <br />-� Depression as <br />1 <br />Temporary EMP -08a <br />. F Tributary <br />%EMP OBz ro <br />an4, AC_� <br />5 <br />Preparation 2013 <br />Plan View <br />4„ annn sr <br />7 End of Year 2015 <br />Plan View <br />1 " =I nnn tr mii7Pi <br />9 End of Year 2017 <br />Plan View <br />1" =1000 ft (DSize) <br />SET Pare <br />r <br />EMP 09 / <br />Channet <br />Name <br />Poverty Gulch Water Management Area <br />100 yr <br />Flow <br />(cfs) <br />Avg. <br />Slope <br />M <br />including North Cresson Development on West Side <br />Flow <br />Depth <br />(R) <br />Chan. <br />Depth <br />(ft) <br />Basin Basin Basin Basin Basin Existing Depression <br />f <br />y,,: nbutary fo�, <br />• EMP -09 - <br />NC -E1 NC -Di NC -C1 NC -81 NC Ai near Schist Island <br />51 <br />- <br />Unti12015 Until 201 EMP -08a <br />•IhtlPaly to <br />2.0 <br />8.6AF <br />Me,:. nP <br />NC -C <br />North Cresson /Schist Island Near -term Controls al�- <br />14.6 <br />3.5 <br />grading ditches along conveniently located Roads to Convey P 20 <br />LTti <br />2.0 <br />9p Storm Water to existing Depression Areaat Schist Island <br />y <br />� - <br />Tnbutary tc. ,eimz <br />-� EMP -21-f �.ms <br />o, <br />o / <br />Future - <br />Natural UnG2015 Basin <br />- <br />2.5 <br />Charnel ♦� PG-F1 <br />• <br />EM 22 <br />- <br />Until 2015 Basin <br />-� <br />t,EAW22 /,�- <br />!"Reconstruct <br />Basin PG -B1 <br />_ <br />l <br />PG-DI <br />North Cresson 20 <br />-- <br />` <br />a <br />Basin Basin <br />_r <br />4.6 <br />Basin PG-C1 PG -A1 n <br />1.5 <br />2.0 <br />Basin PG-E1 A <br />Poverty GI 1 <br />PGA <br />PG -G1 EMP -019 p <br />Spillway <br />234 <br />of <br />10.0 AF Untit 2015 <br />)�I <br />2.5 <br />EMP -022 Secondary Collection Below North Cresson System EMP -021 <br />' <br />a <br />1.9 AF and Permanent Collection and Delivery to EMP -009 7 5 AF <br />I <br />to Single Pond with a <br />g <br />capacity of 9.5 AF total <br />or 6.7 AF Reconstruction <br />Poverty Gulch Storm Water Management Area <br />2 Schematic <br />Consu a <br />Lower South and <br />Upper South Ditches <br />EIVI i� <br />to %P7 <br />6MP-.. <br />r <br />12o.4 ac ' <br />Grade Ditch <br />along Existing Roads <br />Pre and <br />p Existing <br />-� Depression as <br />1 <br />Temporary EMP -08a <br />. F Tributary <br />%EMP OBz ro <br />an4, AC_� <br />5 <br />Preparation 2013 <br />Plan View <br />4„ annn sr <br />7 End of Year 2015 <br />Plan View <br />1 " =I nnn tr mii7Pi <br />9 End of Year 2017 <br />Plan View <br />1" =1000 ft (DSize) <br />SET Pare <br />r <br />EMP 09 / <br />Channet <br />Name <br />� <br />100 yr <br />Flow <br />(cfs) <br />Avg. <br />Slope <br />M <br />Bottom <br />Width (ft) <br />Flow <br />Depth <br />(R) <br />Chan. <br />Depth <br />(ft) <br />RipRap <br />D50(nom) <br />f <br />y,,: nbutary fo�, <br />• EMP -09 - <br />2.8 <br />51 <br />- <br />e 837Acres <br />��� d� �e 1 <br />•IhtlPaly to <br />2.0 <br />Grass <br />Me,:. nP <br />NC -C <br />4.9 <br />14.6 <br />3.5 <br />Construct EMP 22 <br />LTti <br />2.0 <br />Grass <br />y <br />� - <br />Tnbutary tc. ,eimz <br />-� EMP -21-f �.ms <br />14.3 <br />o / <br />Future - <br />to at least 1.4 AF Capacity ; ' t nmFe <br />rr/ <br />- <br />2.5 <br />I uture <br />• <br />EM 22 <br />- <br />271 <br />End of Year 2019 to Mine Life <br />11 Plan View <br />1 " =1000 ft (DSize) <br />End of Year 2014 <br />6 Plan View <br />1 " =1000 ft (DSize) <br />Legend <br />Basin Name <br />Area _ PGx <br />101Aore72cfs- -100yr Discharge <br />10yr Discharge 41 efs 10 AcreFeet -2 x i0yr Volume <br />1'._\- Channel Name <br />100- yrDischarge (cfs) <br />10-yr Discharge (cfs) <br />w m i ... w s Temporary or Existing Channel <br />=i9imimimim Proposed New Channel <br />miwimimiw Mining Boundary <br />End of Year 2016 <br />Plan View <br />1" =1000 ft (DSize) <br />10 End of Year 2018 <br />Plan View <br />-` 1" =1000 ft (DSize) <br />6" +Hv @Q,o <br />2 ► <br />1 Width -- T <br />;�tl� OOn OOn_,0� <br />Bedding: Mirifi Drain Fabric <br />or 6" well graded cobble <br />to sand crushed stone. <br />Channel Dimensions <br />SEDCAD <br />Model & <br />Channel ID <br />Channet <br />Name <br />10 -Yr <br />Flow <br />(cfs) <br />100 yr <br />Flow <br />(cfs) <br />Avg. <br />Slope <br />M <br />Bottom <br />Width (ft) <br />Flow <br />Depth <br />(R) <br />Chan. <br />Depth <br />(ft) <br />RipRap <br />D50(nom) <br />Y" v <br />NC -E <br />2.8 <br />51 <br />3.5 <br />0 <br />1.5 <br />2.0 <br />Grass <br />North Cresson 16 <br />NC -C <br />4.9 <br />14.6 <br />3.5 <br />Construct EMP 22 <br />1.3 <br />2.0 <br />Grass <br />p <br />NC -B <br />14.3 <br />o / <br />Future - <br />to at least 1.4 AF Capacity ; ' t nmFe <br />rr/ <br />- <br />2.5 <br />I uture <br />• <br />EM 22 <br />- <br />271 <br />-� <br />t,EAW22 /,�- <br />!"Reconstruct <br />Em ?2 <br />Ponds EMP-09b, <br />_ <br />l <br />EMP22 <br />North Cresson 20 <br />-- <br />` <br />3.7 <br />_r <br />4.6 <br />r <br />c, and d in Backfill <br />1.5 <br />2.0 <br />Grass <br />Poverty GI 1 <br />PGA <br />11.2 <br />234 <br />of <br />South Globe Hill Mine Area <br />)�I <br />2.5 <br />6" <br />' <br />a <br />14.4 <br />EMP -9a 9b &9c, �` % <br />Functional 3 =;ass <br />EMP -9d removed i ,I' at c�-.� <br />to Single Pond with a <br />g <br />capacity of 9.5 AF total <br />or 6.7 AF Reconstruction <br />4.0 <br />s <br />, <br />�+ -El✓s 0, ) <br />,, , �,., , - -' <br />_ ,- <br />(� . .., .� ham, r . � <br />.: ._, <br />Z111, <br />/� <br />�,. , ,�, � <br />I <br />PG -C <br />add � EMP -0 � � <br />�^ ®ter <br />C.1 �. � .. <br />'r B6.a <br />�.v <br />g <br />;, �✓ ,... �._M�' -ay- � , , <br />., , ... ,t <br />'. l .. a , <br />�^ „'„ � <br />/- <br />`. <br />�y.,., <br />. ,�-, <br />at � �? <br />���� -�� <br />- <br />butary tc <br />i <br />., s °' <br />I <br />_ <br />i <br />PG -D <br />r '/' .; ♦ <br />)) i�'/ nbuta to ,. <br />40.5 , --. • <br />� �„ <br />.� <br />., <br />-;i: a ,: <br />'9 /'EA4P -Q° / ��, <br />, t' 837Acres. <br />. <br />r <br />�;� <br />^a� ° <br />EMP -2 9- <br />.102.6 Acre <br />% k <br />i <br />/�✓ L Di to EMP- 9 <br />i � , > ^. <br />/ �,�4 <br />i <br />� q +, , � \ <br />��"•� <br />PG -E <br />:-�« <br />pn <br />�, �:i < ®p . <br />y� Fi 9 - � <br />,, .. <br />^� \, 27%F/73%SI G Tributary to a <br />the [Wine <br />, <br />- --- <br />20 <br />.Construct EMP -21 ` <br />to at least 8.1 AF <br />\ <br />PG -F <br />° € Tributary <br />to the Mine <br />/' <br />�J <br />,EMR21 <br />v <br />01.0 <br />2.0 <br />for use In 2015 ' EMP 27 t° �. -+, <br />S �� <br />. - 65.4 AC 1 1�` <br />- _ Tnbutary to EMP- 8a <br />� <br />Poverty GI 18 <br />/ j`� EMP -21 �, �5 <br />I .!" m <br />Tributary to <br />ry <br />t� `� <br />-.. <br />f <br />* a EMP- 55% F7 n <br />" <br />5 <br />7 \° <br />x <br />1;ibuPary to <br />314P 21 - <br />� ��b / � y p � � <br />��' ♦' <br />Tnbutary to EMP 08a <br />� =� _ <br />- <br />,0 <br />EMP -21- <br />� * fi °'° o . qr d . . <br />224 A„- cres <br />", <br />slope <br />105-Z cues -, - <br />_ Thhnharvtu <br />End of Year 2014 <br />6 Plan View <br />1 " =1000 ft (DSize) <br />Legend <br />Basin Name <br />Area _ PGx <br />101Aore72cfs- -100yr Discharge <br />10yr Discharge 41 efs 10 AcreFeet -2 x i0yr Volume <br />1'._\- Channel Name <br />100- yrDischarge (cfs) <br />10-yr Discharge (cfs) <br />w m i ... w s Temporary or Existing Channel <br />=i9imimimim Proposed New Channel <br />miwimimiw Mining Boundary <br />End of Year 2016 <br />Plan View <br />1" =1000 ft (DSize) <br />10 End of Year 2018 <br />Plan View <br />-` 1" =1000 ft (DSize) <br />6" +Hv @Q,o <br />2 ► <br />1 Width -- T <br />;�tl� OOn OOn_,0� <br />Bedding: Mirifi Drain Fabric <br />or 6" well graded cobble <br />to sand crushed stone. <br />Channel Dimensions <br />SEDCAD <br />Model & <br />Channel ID <br />Channet <br />Name <br />10 -Yr <br />Flow <br />(cfs) <br />100 yr <br />Flow <br />(cfs) <br />Avg. <br />Slope <br />M <br />Bottom <br />Width (ft) <br />Flow <br />Depth <br />(R) <br />Chan. <br />Depth <br />(ft) <br />RipRap <br />D50(nom) <br />North Cresson 1 <br />NC -E <br />2.8 <br />51 <br />3.5 <br />0 <br />1.5 <br />2.0 <br />Grass <br />North Cresson 16 <br />NC -C <br />4.9 <br />14.6 <br />3.5 <br />0 <br />1.3 <br />2.0 <br />Grass <br />North Cresson 17 <br />NC -B <br />14.3 <br />34.0 <br />2.5 <br />0 <br />1.7 <br />2.5 <br />3" <br />North Cresson 18 <br />NC -A <br />271 <br />56.7 <br />50 <br />60 <br />0.7 <br />3.0 <br />6" <br />North Cresson 20 <br />NC -D <br />3.7 <br />8.3 <br />4.6 <br />0 <br />1.5 <br />2.0 <br />Grass <br />Poverty GI 1 <br />PGA <br />11.2 <br />234 <br />8.1 <br />0 <br />1.3 <br />2.5 <br />6" <br />Poverty GI <br />PG -B <br />14.4 <br />29.0 <br />.7 <br />4.0 <br />1.2 <br />2 <br />3" <br />Poverty GI 3 <br />PG -C <br />9.4 <br />22.5 <br />3.4 <br />0 <br />1.4 <br />2.5 <br />3" <br />Poverty GI <br />PG -D <br />17.6 <br />38.2 <br />15.5 <br />4.0 <br />0.8 <br />2.5 <br />3" <br />Poverty Gl6 <br />PG -E <br />3.6 <br />8.4 <br />14.4 <br />0 <br />0.8 <br />20 <br />3" <br />Poverty GI 17 <br />PG -F <br />4.8 <br />10.9 <br />20 <br />0 <br />01.0 <br />2.0 <br />3" <br />Poverty GI 18 <br />PG -G <br />8.8 <br />20.1 <br />5 <br />0 <br />0.6 <br />1.8 <br />6" <br />3 unannei uimenslons <br />Table <br />13 Post - Reclamation <br />Plan View <br />1 " =1000 ft (DSize) <br />(nom) <br />Crest Area (Ac) 2 ft. (typ) <br />Spillway <br />Elevation <br />Base Area (Ac) <br />Sediment Allowance J <br />(2 ft. typ) Pond Dimensions <br />SEDCAD <br />EMP- <br />Depth <br />Area <br />Area <br />Capacity <br />Outlet <br />E Spillway <br />Spillway <br />Model & <br />Name <br />Base <br />Crest <br />@Crest <br />Pipe <br />Width <br />Elev. <br />Structure ID <br />(ft) <br />(Ac) <br />(Ac) <br />(Ac-Ft) <br />(in) <br />(ft) <br />N.Cresson IS <br />F EMP -8a <br />15 <br />.22 <br />.55 <br />10.5 <br />None <br />6.0 <br />N/A <br />Poverty GI 1 <br />EMP -09 <br />15 <br />.20 <br />4.5 <br />10.0 <br />None <br />6.0 <br />Varies <br />Poverty GI 20 <br />EMP -21 <br />15 <br />.09 <br />.0.8 <br />10.0 <br />None <br />6.0 <br />9965.0 <br />PovertyG12 <br />EMP -22 <br />10 <br />.05 <br />03 <br />1.6 <br />None <br />6.0 <br />10029.0 <br />Notes <br />1. Pond sizes include 2 ft deep allowance for sediment accumulation. <br />2. Emergency Spillways are generally 24- inches below crest. <br />4 EMP- Pond Geometry <br />Table <br />