Laserfiche WebLink
v ) <br />i <br />I <br />1 EMP -018 <br />Plan View <br />1 " =50' (D -Size Dwg) <br />E�. <br />9 <br />c� pSP <br />EGB <br />\ <br />6'0 HDPE <br />. , A SDR171rpeline <br />Ctest 15 Replaced with Open _ <br />Ditch after WHEX <br />fslrL -- <br />is backfrl/ed - <br />4i <br />i� Pump Station - <br />"M�" � � Normal Withdrawal 0.7Acrefeet <br />030 with 3 -Solar Pumps in Parallel <br />�� �p g0 , C7 5gpm /40 psi <br />N N(§ _ ` , 1 rStorm withdrawal 2.6Acre feet <br />l using Mobde/Die e120 HP Pump <br />at 1 cfs 1110 it TDH it - <br />�ey tjfo <br />Emergency Spillway for IMP- x N�ing <br />Backflow from Pond through Ditch N <br />7 Total Earthwork <br />Balanced Cut7FX - 8,200 CY <br />6 "0 Riser Pipe <br />Spillway with <br />6- 1 "O Perforations <br />at12 "centers <br />o� <br />Cut 4ft below <br />grade and build <br />Embankment <br />to Elev. 10055 to <br />provide 9.9 Acre feet <br />Capacity <br />Note. EMP -019 is <br />d will be ` <br />Temporary an Y <br />removed by WHEX. It will s <br />be replaced after WHEX ^Y <br />Backtill with Permanent \ ; <br />EMP -019 <br />3 <br />2 EMP -019 <br />Plan View <br />1"=50'(D-Size Dwg) <br />EMP- 017N- Coarse Sediment <br />Trap Upgrade Existing pond as <br />needed. Pond wlVremove all Sand <br />and coarse Silt Basing B-1, C -1 and 'EMP- 017Main - Rehabilitate <br />outfall from EMP -016 o Capacity Cameron Pond for Ton <br />8s Capacity of 19.7Acre Feet. ,Pond <br />Designed for Sediment Removal �J �ydD 6' serves as Clear -water pool and <br />effieieacy Eu f a - source for dust - control & <br />6 <br />construction water, <br />12" Outlet Riser with y o� <br />Inlet at El. 10014. Routes �6 <br />and reduces flow to EMP- 019Main <br />to 6 tivmproved settling <br />effecenes <br />100 yr Spillway to Pump System to <br />EMP -17 Clear -water Pond Evacuate EMP -017 and use <br />Q <br />-Grass - linedInterceptor water for Dust Control and <br />forBas ri ECOSA-CI Construction water <br />W" EMP - 017S - Coarse <br />Sediment Trap for Basin ECOSA-DI From Basin <br />Existingpond upgraded as ECOSA-DI <br />necessary. <br />Ew ^- <br />t <br />1 <br />4 EMP -017 (Rebuilt Cameron Ponds) <br />Plan View <br />1"=50'(D-Size Dwg) <br />Notes and General Specifications: <br />1. The dimensions and construction of ditches are listed on Tables at <br />right, along with the armoring requirements (3" Riprap, 6" Riprap or <br />vegetated channels). The freeboard includes a minimum of 6- inches <br />at the 100 year calculated discharge plus the velocity head depth. <br />2. EMP Ponds and their embankments are intended to be water tight <br />because of their proximity to high walls of the mining areas. <br />Accordingly, they shat/ be constructed to conform to the following <br />general specifications: <br />a. Strip the footprint of the pond area down to suitable non - organic <br />soils with no less than 15-20% fines ( <200 mesh). Proof roll the <br />footprint and compact as needed to achieve a target density of no less <br />than 90% in the basin and no less than 95% Std Proctor in the <br />embankmant. <br />b. Select soils for the embankment that have at least 15% fines. <br />Place and compact the embankment soils in 8 -inch maximum loose <br />layers and compact to at least 95% Std. Proctor density. <br />c. Maximum slope of embankment shall be 2 :1. Maximum slope <br />inside sediment basin shall be 1.75.1. Maximum slope of reseeded <br />areas shall be 3:1. <br />3. An emergency spillway shall be constructed at each pond with a <br />finished invert elevation approximately 2.0 feet lower than the crest <br />and a base width of 6.0 feet. The spillway shall be armored with 6" <br />angular nprap place on 6- inches of sandy- gravel bedding and a layer <br />of Mirifi drain fabric. <br />I <br />I <br />�� II <br />I / 6 Low -level <br />Diaia and Riprap <br />.Spilhway <br />0 <br />s'6, 1 / <br />10 1 <br />rn <br />I <br />Temporary-- <br />ti o rn o o <br />; <br />Basm <br />rn co <br />r: <br />DA7 U1VL FLF <br />_ m � _ �_� <br />WHEX -D <br />cD N co ai cfl <br />-��_ tr N <br />-��i <br />0 0 <br />- 9950.00 O O O <br />Basin <br />�I <br />', WHEX -i <br />EMP -010 <br />Tea <br />E« <br />g <br />h1 b <br />CIO b' <br />o� <br />MIN <br />CS <br />i <br />r <br />1 <br />Total Earthwork <br />Balanced d Cut/Fill -3,000 CY <br />North Interceptor at <br />Toe ofECOSA <br />South Interceptor <br />at Toe ofECOSA embankment <br />EMP -020 <br />Plan View <br />1 "=50'(D-Size Dwg) <br />Grassy Valley Storm Water Management Area Transfer Pumps - 18 <br />Wild Horse Extension (WHEX) and ECOSA gpm Solar z One cis <br />Basin Basin Mobile @ 100 ft TDH <br />IHEX - -A WHEX -B Vindicator <br />Basin <br />�VINAI Basin <br />EMP -018 T <br />5.7AF <br />3.9 AF Basin <br />'� ------ - - - - -- WHEX-. <br />toe Basin <br />Pond ECOSA-A1 <br />�_.. <br />Perforated <br />Weep Pipe <br />Dram -- <br />Clay Basin <br />Area ECOSA-Bl <br />Basin 1 <br />ECOSA-Cl <br />''BMMMOMn •MME EMP -013 Spillway <br />■ 111, 1.8 AF <br />■ <br />Spillway <br />EMP -019 ■ After WHEX <br />9.9 AF ■ / Backfill, Grassy <br />■ / Valley is Restored <br />■ Highway Basins <br />Perforated ■ Flow Direct to <br />V� Weep Pipe 0 Grassy Creek <br />MP -016 Drain ■ w/o Detention <br />5.2AF - �`- Basin <br />0 ECOSA-E1 <br />■ <br />■ <br />■ EMP 020 <br />Spillway ■ <br />:EC asin ■ OAF <br />way SA-D1 <br />■ J l <br />I A1 <br />O Upper Grassy Valley Storm Water Management Area <br />10 <br />i <br />EadstingEMP -016 <br />Verify Capacity at <br />`� l9 5.2 Acre feet, <br />� 1 <br />Existing <br />O <br />Riprap Lmed <br />Channel ` <br />from EMP 10 \ 1 <br />Construct Perforated Riser oo <br />Spillway - 670 Pipe with ` <br />6 ea. 1' O Perf. @ 2" Centers -' <br />EC� <br />Channel from NW Toe <br />ofECOSAStockpile <br />Existing EMP -016 <br />3 Plan View <br />1 " =50' (D -Size Dwg) <br />i <br />1024 10200 �t <br />10160 Natur. <br />10120 Slope <br />10080 <br />10040 <br />WHEX Mine Area Backflll <br />Cut through <br />Ridge <br />Natural Slope <br />100K ca <br />ti o rn o o <br />r o rn <br />� co r- N rn <br />rn co <br />r: <br />DA7 U1VL FLF <br />_ m � _ �_� <br />- % tri <br />rn <br />cD N co ai cfl <br />-��_ tr N <br />-��i <br />0 0 <br />- 9950.00 O O O <br />A c <br />O O O O Cl) O O <br />N X, <br />O O O <br />`" ti o 0 0 0 <br />o O O O O O <br />O O <br />6'S <br />6 <br />10204.0 <br />7 <br />EMP -10 <br />0 +00 5 +00 10 +00 15 +00 20 +00 25 +00 <br />30 +00 35 +00 40 +00 <br />45 +00 <br />7 PROFILE B, SHEET <br />3- Reconstructed Stream <br />Corridor Across <br />WHEX after Backfill <br />9 <br />Profile View <br />10 <br />.375 <br />1.72 <br />9.9 <br />1" =500 ft (DSize) <br />6..0 <br />10055.0 <br />11 <br />EMP -16 <br />Total Earthwork <br />Balanced Cut/Fill- 16,000CY -6"0 Riser Pipe <br />Pond Capacity 9Acre Feet 15' 6 ea. 1 "0 Holes at <br />12" Vertical Centers <br />(nom <br />p� -Crest Area (Ac) 2 ft. (typ) <br />��'�. Spillway <br />- Elevation <br />I I I I 1 I <br />- -Base Area (Ac) \ <br />1 Sediment Allowance <br />I (2 ft. typ) Pond Dimensions <br />Riprap Emergency <br />Spillway <br />SEDCAD <br />Structure <br />ID <br />EMP - <br />Name <br />Depth <br />(ft) <br />Area <br />Base <br />(Ac) <br />Area <br />Crest <br />(Ac) <br />Capacity <br />@Crest <br />(Ac -Ft) <br />Outlet <br />Pipe <br />(in) <br />E Spillway <br />Width <br />(ft) <br />Spillway <br />Elev. <br />4 <br />18 EMP <br />15 <br />22 <br />.55 <br />5.7 <br />6'S <br />6 <br />10204.0 <br />7 <br />EMP -10 <br />10 <br />.20 <br />.55 <br />3.9 <br />None <br />6..0 <br />101250 <br />9 <br />EMP -19 <br />10 <br />.375 <br />1.72 <br />9.9 <br />67 <br />6..0 <br />10055.0 <br />11 <br />EMP -16 <br />15 <br />.21 <br />76 <br />5.2 <br />67 <br />6 <br />10039.0 <br />15 <br />EMP -17N <br />8 <br />.131 <br />.283 <br />1.6 <br />12 "S <br />10.0 <br />10018.0 <br />16 <br />EMP -17M <br />15 <br />.88 <br />1.57 <br />19.7 <br />None <br />6-0 <br />9989.0 <br />S2 <br />EMP 20 <br />15 <br />.39 <br />.84 <br />9.0 <br />None <br />6 -0 <br />9942.5 <br />V1 <br />EMP -13 <br />10 <br />.10 <br />.27 <br />1.8 <br />None <br />6.0 <br />10100.0 <br />Notes: <br />1. Select Ponds include outlet risers consisting of 6 "HDPE Pipe and <br />1'0 perforations, 6 per row, at 12 -inch intervals. <br />2. Pond sizes include 2 ft. deep allowance for sediment accumulation. <br />3. Emergency Spillways are generally 24- inches below crest <br />4. EMP Ponds with Perforated Outlet drains are not terminal facilities <br />and may be designed for one 10 yr /24 -hr storm volume since their <br />Depth <br />2 <br />1 <br />Width <br />Bedding: Mirifi Drain Fabric <br />or 6" well graded cobble <br />to sand crushed stone. <br />Channel Dimensions <br />Fbd <br />6 " +HV@ <br />Q100 -24 <br />SEDCAD <br />Channel <br />ID <br />3hannel <br />Name <br />10 -Yr <br />Flow <br />(cfs) <br />100 yr <br />Flow <br />(cfs) <br />Avg. <br />Slope <br />( %) <br />Bottom <br />Width (ft) <br />Flow <br />Depth <br />(ft) <br />Chan. <br />Depth <br />(ft) <br />MpRap <br />D50(nom) <br />1 <br />WH -A <br />9 <br />17 <br />5.8 " <br />4 <br />1.5 <br />2.6 <br />3 <br />2 <br />WH -B <br />14 <br />27 <br />3.1 <br />4 <br />.7 <br />1.5 <br />3 <br />3 <br />WH -C1 <br />6 <br />15 <br />70 <br />4 <br />.6 <br />1.5 <br />3 <br />WH -C2 <br />23 <br />44 <br />8.0 <br />4 <br />1.0 <br />2.3 <br />6 <br />6 <br />WH -D <br />22 <br />46 <br />10.7 <br />7 <br />0.8 <br />20 <br />6 <br />8 <br />WH -E <br />60 <br />120 <br />3.3 <br />6.5 <br />1.8 <br />3.0 <br />6 <br />WH -F <br />2.5 <br />3.4 <br />50 <br />4 <br />0.5 <br />1.5 <br />6 <br />Pipe <br />MP -18 <br />1 <br />1 <br />6 PE <br />10 <br />EC -A <br />20 <br />45 <br />4.2 <br />4 <br />1.1 <br />2.3 <br />6 <br />12 <br />EC -B <br />55 <br />106 <br />11.5 <br />6 <br />1.4 <br />3.1 <br />6 <br />Pipe <br />EC -C <br />6 <br />6 <br />8 <br />12'PE <br />13 <br />ED -G <br />10 <br />26 <br />1.4 <br />4 <br />.9 <br />1.7 <br />6 <br />14 <br />EC -D <br />10 <br />21 <br />1.4 <br />4 <br />.9 <br />1.7 <br />6 <br />SIA <br />EC -E <br />21 <br />42 <br />4.7 <br />4 <br />1.1 <br />23 <br />6 <br />SIB <br />ED -F <br />41 <br />84 <br />4.7 <br />8 <br />1.1 <br />2.5 <br />6 <br />V1 <br />VIA <br />10 <br />36 <br />25 <br />6 <br />0.6 <br />21 <br />6 <br />contents are automatically evacuated to a terminal storage basin. <br />(EMP- Pond Dimensions �bChannel Dimensions and Design Specifications <br />� )Table <br />Runoff from 6tt HDPE Pipeline EMP-1 7 <br />Brow Ditch along Cameron Ponds <br />Crest of WHEX Mine Area County Road from EMP -18 to Reconstructed to <br />10320 EMP -16 (SDR17) EMP -19 <br />10280 - ---- - -- -- - - - - -- existin Receive water from all <br />10240 ~ } [ g] EMP- s for reuse as <br />L tt Construction Water <br />1 0200 2 Ven tat <br />10160 High Point EMP -16 <br />10120 � <br />EMP -18 with 75 HP [existing] <br />10080 Transfer Pump <br />10040 M o 0 0 rr o N o r. o N o -- - -- o <br />o M o co M o N <br />cd (:6 116 1.6 i o <br />A 7,Uy L,M� ° v-: a5 r aS oo cd K er 0 <br />M M N N N N N ti N N N N N N N ( n Q o o O o o O o 0 0 o O <br />9980.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 <br />� n n n n n P t` n n n ti n ti n !� <br />0 +00 5 +00 10 +00 15 +00 20 +00 25 +00 30 +00 35 +00 40 +00 45 +00 50 +00 55 +00 60 +00 65 +00 70 +00 75 +00 80 +00 <br />PROFILE A SHEET 3- Grassy Valley Storm Water Channel and EMP- Polnds <br />Profile view Steffens and Associates <br />1" =500 ft (DSize) Cresson Mine1%u6nc-", <br />Water Resources - Environmental - Mining Eng <br />