Laserfiche WebLink
WILDLIFE <br />PROTECTION <br />PLAN <br />Cripple Creek & Victor Gold Mining Co. <br />Cresson Project <br />CONTENTS OF THE PLAN <br />I. Introduction <br />II. Preventative Measures within Respective Areas of Activity <br />A. Lined Ponds <br />B. Active Leaching or Process Facilities <br />C. Mine Area and Other Excavations or Disturbances <br />D. Haul Roads and Access Roads <br />E. Buildings and Administrative Areas <br />F. Property -Wide Considerations <br />III. Maintenance and Inspections of Preventative Measures <br />A. Inspections <br />B. Maintenance <br />IV. Legacy Considerations <br />A. Reclamation <br />B. Biodiversity <br />C. Sustainability <br />V. Reporting Wildlife Findings <br />A. Wildlife Injured or Sick <br />B. Wildlife Fatalities <br />APPENDIX A - <br />"Procedures for Handling and Reporting Wildlife Incidents to the Colorado Division of Wildlife ", <br />provides guidance for Environmental Resources when reporting sick, wounded or dead wildlife <br />findings to the Colorado Division of Wildlife ( "CDOW "). <br />CC &V Wildlife Protection Plan Page 1 of 7 <br />EMS: AGANA/CC &V Printed Copies are Uncontrolled <br />S: \4 -0055 CC &V MLE2 \CDRMS A10 Application \Updates from 12 -19 -2011 Mtg\MLE2 \Wildlife Protection Plan.doc <br />November 22, 2011 <br />Doc. # E -042 <br />Rev 0, <br />