Laserfiche WebLink
REASON FOR INSPECTION: <br />Normal I &E Program <br />BOND CALCULATION TYPE: <br />None <br />BOND AMOUNT: <br />$71,404.00 <br />DATE OF COMPLAINT: <br />NA <br />POST INSP. C 0 , TACTS: <br />None <br />JOINT INSP. AGENCY: <br />None <br />WEATHER: <br />Clear <br />INSP ' : ' S G URE: <br />/ �=- <br />SIGNATURE DATE: <br />February 24, 2012 <br />MINE NAME: <br />83rd Joint Venture <br />MINE/PROSPECTING ID #: <br />M -1992 -069 <br />MINERAL: <br />Sand and gravel <br />COUNTY: <br />Weld <br />INSPECTION TYPE: <br />Monitoring <br />INSPECTOR(S): <br />Peter S. Hays <br />INSP. DATE: <br />February 10, 2012 <br />INSP. TIME: <br />10:30 <br />OPERATOR: <br />Aggregate Industries - WCR, Inc. <br />OPERATOR REPRESENTATIVE: <br />Connie Davis <br />TYPE OF OPERATION: <br />112c - Construction Regular Operation <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />MINERALS PROGRAM INSPECTION REPORT <br />PHONE: (303) 866 -3567 <br />The Division of Reclamation, Mining and Safety has conducted an inspection of the mining operation <br />noted below. This report documents observations concerning compliance with the terms of the permit <br />and applicable rules and regulations of the Mined Land Reclamation Board. <br />The following inspection topics were identified as having Problems or Possible Violations. OPERATORS <br />SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br />WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br />Possible Violation is indicated, you will be notified under separate cover as to when the Mined Land <br />Reclamation Board will consider possible enforcement action. <br />INSPECTION TOPIC: Hydrologic Balance <br />PROBLEM /POSSIBLE VIOLATION: Problem: The Division has no evidence the Operator has an approved water <br />augmentation plan for the exposed groundwater at the site. This is a problem related to 34- 32.5- 116(4)(h) of <br />the Colorado Revised Statutes and 3.1.6(1)(a) of the Construction Materials Rules and Regulations governing <br />injury to existing water rights. <br />CORRECTIVE ACTIONS: The Operator shall demonstrate the operation is in compliance with the Office of the <br />State Engineer, show evidence that the operator is taking measures to bring the site into compliance with the <br />SEO and Division, or backfill the pits to at least two feet above the groundwater surface by the corrective action <br />date specified. Please reference the observation section of this inspection report for more information and <br />options to achieve compliance. <br />CORRECTIVE ACTION DUE DATE: 3/25/12 <br />ce/ <br />Page 1 of 7 <br />