My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-02-14_REVISION - M1999120
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999120
>
2012-02-14_REVISION - M1999120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:48:39 PM
Creation date
2/16/2012 3:47:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999120
IBM Index Class Name
REVISION
Doc Date
2/14/2012
Doc Name
REVISION SR02 WITHDRAWN
From
DRMS
To
LYNN SHULTS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />February 14, 2012 <br />Ms. Lynn M. Shults <br />L.G. Everist, Incorporated <br />7321 E. 88th Ave., Ste 200 <br />Henderson, CO 80640 <br />Re: Ft. Lupton Sand and Gravel Mine, Permit No. M- 1999 -120, Revision SR -2 <br />Dear Ms. Shults: <br />On February 6, 2012 the Division of Reclamation, Mining and Safety conducted an inspection of the Hill /Oakley and <br />eastern Ft Lupton Phases of the Ft. Lupton Sand and Gravel site operated by LG Everist. This inspection was <br />conducted as a result of surety reduction request SR2. The surety reduction request was submitted to the Division on <br />December 27, 2011 based on the approval of the Hill/Oakley slurry wall by the State Engineer's Office, as well as the <br />completion of all earth work associated with the Hill/Oakley Phase and eastern part of the Ft Lupton Phase by LG <br />Everist. The bond associated with the slurry wall for the Ft Lupton Phase of the site has already been released by the <br />Division. <br />The Division concluded from the inspection that the earthwork for the Hill/Oakley and eastern portion of the Ft <br />Lupton Phases of the site has been completed according to the approved reclamation plan. However, as a result of <br />further discussions with LG Everist, it has been determined that it would be more appropriate to make the adjustments <br />to the required reclamation bond amount in conjunction with the review of an upcoming amendment application for <br />this site. Therefore, LG Everist has withdrawn SR2 and no bond adjustment will be made at this time. <br />If you have any questions, please contact me. <br />Sincerely, ijaiF <br />Eric C. Scott <br />Environmental Protection Specialist <br />Office of <br />Mined Land Reclamation <br />STATE OF COLORADO <br />COLORADO <br />DIVISION OF <br />RECLAMATION <br />MINING <br />— &— <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta Pineda <br />Director <br />Office of <br />Denver • Grand Junction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.