My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-19_REVISION - M1997007
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997007
>
2012-01-19_REVISION - M1997007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:25:36 PM
Creation date
1/23/2012 7:58:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997007
IBM Index Class Name
REVISION
Doc Date
1/19/2012
Doc Name
Initial Adequacy Comments
From
Acme Brick Company
To
DRMS
Type & Sequence
AM1
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Acme Brick Company <br />Castle Rock, CO <br />January 17, 2012 <br />Mr. Berhan Keffelew <br />Environmental Protection Specialist <br />State of Colorado <br />1313 Sherman Street/ Room 215 <br />Denver, Co 80203 <br />Re: Bijou Clay Mine, File No.M- 1997 -007, Initial Adequacy Comments. <br />Dear Mr. Keffelew: <br />Exhibit G Water Information Rule 6.4.6 <br />merican <br />Tile <br />FOoll ACME <br />BRICK <br />Texas <br />Quarries <br />RECEIVED <br />JAN 1 9 .i fl 2 <br />Division of Reclamation, <br />Mining ex 3af €ty <br />This letter presents the applicant's response to the Division of Reclamation <br />Mining and Safety adequacy comments concerning the Bijou Clay Mine File <br />No. M- 1997 -007 pre - operational inspection 12/9/11. <br />Itemized below are the applicant's responses to individual adequacy comments. <br />The Division's comment appears in italics followed by the applicant's response. <br />In the amended area, there appears to be a dry gulch orienting east to west. The <br />dry gulch was observed during the per - operational inspection. Does the operator <br />plan to reestablish the gulch to its original location after mining is completed? Are <br />there any plans to temporarily divert channel the drainage away from the <br />amended area? The reclamation plan map does not show the channel being <br />established to its original location of the channel to its original location. Please <br />explain. <br />Acme is planning to reestablish natural drainage as close to the original <br />drainage as possible once mining has been completed. Berms will be <br />placed as necessary to divert drainage from the mining area during <br />operations. Post mining structural controls (dirt berm and/or rip -rap) will be <br />implemented to control erosion /sediment from leaving the affected area. <br />/JI <br />LHBP <br />
The URL can be used to link to this page
Your browser does not support the video tag.