Laserfiche WebLink
MINE ENGINEERING <br />MINE RECLAMATION <br />January 13, 2012 <br />Brock Bowles <br />Division of Reclamation, Mining & Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Bowie Resources, LLC, Bowie No. 2 Mine <br />MR -128, Adequacy Response #1 <br />Permit C- 1996 -083 <br />Dear Mr. Bowles: <br />J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7 STREEET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX 242 -7908 <br />On behalf of Bowie Resources, LLC, (BRL), the amended data are enclosed. <br />DRMS: On Map 42 Terror Creek Shaft - Plan View and Details, the soil nail walls are <br />not identified in the plan view at left, nor in the Legend. Please revise Map 42 to reflect <br />the location of the soil nail walls. <br />BRL: Please see revised Map -42 <br />DRMS: Map 18 -2 shows post- mining topography for the Terror Creek fan site, together <br />with a series of four Sections (1 thru 4) showing the pre- mining, operational, and post - <br />mining surfaces. I suggest that it would be helpful 1) if Map 18 -2 referenced Map 42 for <br />the operational plan view, and 2) if the locations of Sections 1 thru 4 could be shown on <br />Map 42, with a corresponding reference back to map 18 -2 for the Cross Sections. <br />BRL: Please see revised Maps -42 and 18 -2 <br />DRMS: The footers in the revised pages are not labeled correctly. Some of the footers <br />are blank, labeled MR -127 or MR -168 and not all the dates are consistent. Please fix all <br />the footers to reflect MR -128 and the correct date. <br />BRL: Please see revised pages 2.05 -21, 65, 66, 67, 101, 102 & 103 <br />Please feel free to call me if you have any questions. <br />Sincerely, <br />i <br />J. E. stover, P.E. <br />Consulting Engineer <br />7 7017 <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />,, Kedamaiion, <br />Mining <br />and Safety <br />