Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />006 <br />007 <br />008 <br />Disposal of misc. scrap <br />DEMOLISH <br />----- <br />0.00 <br />$2,508.92 <br />$4,496.24 <br />$28,129.78 <br />$23,797.07 <br />$169.00 <br />$1,010.00 <br />$35,565.69 <br />$2,760.69 <br />Highwall Reduction to 3H:1V <br />DOZER <br />21.76 <br />Rip and Grade Pit Floor and Stockpile Area, <br />Approx. 32 acres <br />DOZER <br />133.03 <br />Replace Topsoil <br />DOZER <br />115.19 <br />Install Rip Rap in Drainage Ditches <br />LOADER <br />1.58 <br />Place Rip Rap in Drainage Ditches <br />EXCAVATE <br />13.90 <br />Revegetation <br />REVEGE <br />40.00 <br />Mobilize/Demobilize <br />MOBILIZE <br />4.40 <br />SUBTOTALS: <br />329.86 <br />$ $98,437.39 <br />Task description: SI -01 <br />Site: Weber Pit No 2 <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />000 <br />12/19/2011 <br />KAP <br />Agency or organization name: <br />TASK LIST (DIRECT COSTS) <br />COST SUMMARY <br />Permit Action: 2011 Inspection <br />State: Colorado <br />County: Archuleta <br />DRMS <br />Permit/Job #: M1995056 <br />Abbreviation: None <br />Filename: M056 -000 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and/or administration: <br />2.02 Total = <br />0.00 v , 1 u I i Total = <br />164.93 Total = <br />10.00 Total = <br />t,e..a;:;; all =1 - -- 1 TOTAL O & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />500.00 <br />8.00 <br />5.81 <br />CONTINGENCY: 0.00 <br />Total = <br />Total = <br />$1,988.44 <br />$0.00 <br />$9,780.35 <br />$9,843.74 <br />$21,612.53 <br />$120,049.92 <br />500.00 <br />$9,603.99 <br />$6,974.90 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $38,691.42 <br />TOTAL BOND AMOUNT (direct + indirect) = $137,128.81 <br />