Laserfiche WebLink
Hernandez, Daniel <br />From: Hernandez, Daniel <br />Sent: Wednesday, September 28, 2011 1:14 PM <br />To: 'jestover @bresnan.net' <br />Cc: Musick, Jason; 'Susan Patt 'Ron Thompson'; Berry, David <br />Subject: FW: New Elk, TR59 Adequk, <br />Attachments: NewElk_TR59_RCE.pdf <br />Hello Jim — <br />Below is Jason Musick's adequacy review of Technical Revision TR59 for New Elk Coal Company's New EIk Mine. <br />Technical Revision TR59 was submitted in response to DRMS Notice of Violation CV- 2011 -003 for creating disturbances <br />at mine's surface facilities beyond approved permit and disturbance boundaries. <br />Attached also is Jason's reclamation cost estimate. The attached cost estimate does not include reclamation of the 500' <br />temporary conveyor, nor the 200' permanent conveyor, nor the 2 radial stackers, nor any concrete foundations for the <br />stackers and the permanent conveyor for the Refuse Disposal Area that were initially part of TR59. This is because it is <br />our understanding that these pieces of equipment will now be made part of the application for Minor Revision MR97 for <br />the New EIk Mine that is requesting a change in configuration of the maintenance corridor of the Refuse Disposal Area <br />conveyor. <br />Dan <br />Daniel I. Hernandez <br />Daniel I. Hemandez <br />Senior Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman St, Room 215 <br />Denver, CO 80203 <br />New Phone Number: 303 - 866 -3567 ext 8126 <br />Fax: 303 - 832 -8106 <br />Website: www.mininq.state.co.us <br />From: Musick, Jason <br />Sent: Wednesday, September 28, 2011 12:45 PM <br />To: Hernandez, Daniel <br />Subject: New EIk, TR59 Adequacy <br />Dan, <br />The following are the adequacy issues I have identified that are associated with TR59: <br />1 <br />• Based on a review of the approved Map 13 in the PAP, the proposed disturbance area runoff of the addition <br />requested in TR59 is not delineated. Please have New Elk discuss the manner in which the proposed disturbed <br />area runoff will be collected and treated. <br />• Regarding proposed revised pages 2.05 -27, 2.05 -27a, and 2.05 -6a (Table 19), proposed revised Map 11 -Sheet 3, <br />and proposed revised Exhibit 28, please have New Elk revise these materials to remove references to the 200' <br />fixed conveyor, the 500' temporary conveyor, and demolition and mob /demo associated with the radial stacker <br />pads and conveyor footings. It's my understanding that these pieces of equipment will be addressed via Minor <br />Revision MR97, which the Division is also currently reviewing. <br />• The Division has compiled a reclamation cost estimate for the tasks associated with the reclamation of the C &W <br />Train Shop Facilities Area. This estimate is sufficient to reclaim all areas associated with the proposed addition <br />of facilities under TR59. Based on discussions with New Elk, the proposed 200 ft fixed conveyor, 500 ft temp. <br />