My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-08_REVISION - M1980244 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2011-11-08_REVISION - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:44:52 PM
Creation date
11/8/2011 12:46:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/8/2011
Doc Name
Response- via email.
From
CC&V
To
DRMS
Type & Sequence
TR62
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i4 logo -" etz5 <br />Cazier, Tim `Tlz- 6 2.. a ESAeNse <br />From: Corner, Timm [TComer @AngloGoldAshantiNA.com] <br />Sent: Tuesday, November 08, 2011 8:28 AM <br />To: Cazier, Tim <br />Subject: RE: LOB Project vs. VLF Phase 4c Berm Raise <br />Categories: CC &V <br />Tim, <br />I confirmed with AMEC that 80 -mil single -sided textured LLDPE was used for VLF Phase 4c Berm Raise. <br />Timm <br />From: Cazier, Tim fmailto :Tim.Cazier(astate.co.usl <br />Sent: Tuesday, November 08, 2011 8:14 AM <br />To: Corner, Timm <br />Subject: RE: LOB Project vs. VLF Phase 4c Berm Raise <br />Timm, <br />For the purpose of clarification, my question with respect to using the 60- or 80 -mil LLDPE was directed towards the <br />material used for the, not the LOB project. Can you confirm the 80 -mil single -sided textured LLDPE was also used for the <br />subject berm raise? <br />Thanks. <br />Tim Cazier, P.E. <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />ph: 303 - 866 -3567 x8169 <br />fax: 303-832-8106 <br />tim.cazier @state.co.us <br />From: Corner, Timm fmailto :TComer©AngloGoldAshantiNA.coml <br />Sent: Monday, November 07, 2011 3:36 PM <br />To: Cazier, Tim <br />Subject: RE: Next CC &V Inspection <br />Tim, <br />I followed up on the liner at the LOB Project. It was the same liner we used at Phase 5: 80 -mil single -sided textured. <br />Timm <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.