Laserfiche WebLink
1 <br /> 77 -Y23 <br /> Climax Mine ,;* 7 j <br /> Power Costs estimate for Water Handling at the Climax Mine <br /> ' 1 , <br /> Facility Annual Costs <br /> Warren's Pump Station $ 100,124 <br /> Domestic Water System(Fresh Water Feed) $ 21,636 <br /> Mayflower Substation $ 66,000 <br /> 5-Shaft Pump Station $ 62,628 <br /> Storke Wastewater $ 27,988 <br /> 4-Dam Seep $ 1,741 <br /> Lime Plant $ 12,543 <br /> Total $ 292,661 <br /> Assumptions: <br /> $0.05/kwh <br /> Average annual pump hours for the facility <br /> Average water year <br /> 3-Year @10,000 of 877,982.24 <br /> 5-Year @ 3,400 of 482,890.23 <br /> Total 1,360,872.47 <br /> f <br />