Laserfiche WebLink
Dudash, Joe <br />From: Welt, Kathy [KWelt @archcoal.com] <br />Sent: Wednesday, November 17, 2010 3:01 PM <br />To: Kent Davenport; Bowie Resources /Bill Bear email; 'jim_kiger @omi.oxbow.com'; Dudash, Joe <br />Cc: Steve Metheny; Doug Cox; Cody Carver; Bill Hughes; D.B. Watkins; Nolte, Doug <br />Subject: RE: Bear No. 3 SL -4 Remaining Issues <br />Given DMEA's potential future use of power pole number 50- HSB98L2 located on Mountain Coal <br />Company, LLC (MCC) property at the Bear No.3 Mine site, as well as DMEA's commitment to remove <br />the pole and powerline number D2ACSR when it is no longer useful for their purposes (as below), it is <br />acceptable for the pole and powerline to remain in place on MCC property at this time. <br />3Cathy Weft, <br />Environmental Engineer 111 <br />Mountain Coal Company, LLC <br />West Elk Mine <br />P.O. Box 591 <br />Somerset, CO 81434 <br />Phone (970) 929 -2238 <br />Cell (970) 433 -1022 <br />Fax (970) 929 -5050 <br />From: Kent Davenport [mailto:kent.davenport@dmea.com] <br />Sent: Monday, October 25, 2010 2:50 PM <br />To: Bowie Resources /Bill Bear email; Welt, Kathy; 'jim_kiger @omi.oxbow.com'; 'Joe.Dudash @state.co.us' <br />Cc: Steve Metheny; Doug Cox; Cody Carver; Bill Hughes; D.B. Watkins <br />Subject: RE: Bear No. 3 SL -4 Remaining Issues <br />To Whom it May Concern: <br />Delta- Montrose Electric Association (DMEA) owns two poles and the wire (3 phase wires and a neutral wire) connecting <br />the poles in the Somerset area related to this issue. A pdf map is attached to this email to clarify the location of these <br />facilities —see the yellow hi- lighted area for referenced facilities. The pole numbers are 50- HSB98L1 and 50- HSB98L2. <br />DMEA would prefer to leave these two poles and the connecting wires —as is— indefinitely. These facilities are helpful to <br />DMEA as a backup connection to the area electrical distribution system in the event DMEA's Somerset Substation is <br />unavailable. DMEA used these facilities in 2008 to serve electric loads in the Somerset /North Fork areas while DMEA's <br />Somerset Substation was out of service for an upgrade. If these facilities were removed, it would be difficult to rebuild <br />back to this location at a future date in a timely basis, especially with the need for a railroad crossing permit. DMEA is <br />also willing to commit to removing these facilities at DMEA's cost whenever they are deemed no longer useful to DMEA. <br />Kent Davenport <br />DMEA <br />Kent E. Davenport, P.E. <br />Engineering Manager <br />Delta - Montrose Electric Association <br />(970) 240- 1261 voice <br />(970) 240- 6861fax <br />kdavenport@dmea.com <br />P.O. Box 910 <br />Montrose, CO 81402 <br />www.DMEA.com <br />1 <br />