Laserfiche WebLink
REASON FOR INSPECTION: <br />Surety Release Requested <br />BOND CALCULATION TYPE: <br />Complete Bond <br />BOND AMOUNT: <br />$126,837.00 <br />DATE OF COMPLAINT: <br />NA <br />POST INSP. CONTACTS: <br />None <br />JOINT INSP. AGENCY: <br />None <br />WEATHER: <br />Clear <br />INS ECT R'S,F / �I � I�i,AT URE: <br />//� ii <br />SIGNATURE DATE: <br />August 9, 2011 <br />MINE NAME: <br />Bijou Clay Mine <br />MINE/PROSPECTING ID #: <br />M -1997 -007 <br />MINERAL: <br />Clay (general) <br />COUNTY: <br />Elbert <br />INSPECTION TYPE: <br />Surety Release Inspection <br />INSPECTOR(S): <br />Jared L. Ebert <br />INSP. DATE: <br />July 15, 2011 <br />INSP. TIME: <br />12:12 <br />OPERATOR: <br />The Denver Brick Company <br />OPERATOR REPRESENTATIVE: <br />Robert Tibbetts and John Cona <br />TYPE OF OPERATION: <br />112c - Construction Regular Operation <br />colz COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />MINERALS PROGRAM INSPECTION REPORT <br />PHONE: (303) 866 -3567 <br />The Division of Reclamation, Mining and Safety has conducted an inspection of the mining operation <br />noted below. This report documents observations concerning compliance with the terms of the permit <br />and applicable rules and regulations of the Mined Land Reclamation Board. <br />The following inspection topics were identified as having Problems or Possible Violations. OPERATORS <br />SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br />WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br />Possible Violation is indicated, you will be notified under separate cover as to when the Mined Land <br />Reclamation Board will consider possible enforcement action. <br />INSPECTION TOPIC: Signs & Markers <br />PROBLEM: The affected area boundary markers are incorrectly placed. This is a problem for failure to maintain <br />boundary markers around the affected area as required by Section 3.1.12(2) of the rule. <br />CORRECTIVE ACTIONS: The Operator shall conduct a survey and replace the boundary markers in the correct <br />location(s) based on the new permit boundary given the approval of Acreage Reduction Request 02. The <br />Operator shall provide proof to the Division that this has been done by the corrective action date. <br />CORRECTIVE ACTION DUE DATE: 9/09/11 <br />Page 1 of 5 <br />