My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-07-22_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2011-07-22_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:35:57 PM
Creation date
7/25/2011 11:17:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
7/22/2011
Doc Name
3rd Adequacy Review Letter
From
DRMS
To
Colowyo Coal Company
Type & Sequence
PR3
Email Name
DIH
JHB
RDZ
TAK
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION OF RECLAMATION, MINING AND SAFETY <br />Deparhnent of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (3031866-356] <br />FAX: (303) 832 -8106 <br />STATE OF COLORADO <br />COLORADO <br />DIVISION OF <br />RECLAMATION <br />MINING <br />—bt- <br />SAFETY <br />July 22, 2011 <br />John W. Hickenloo er <br />Mr. Kurt Blunt <br />C..nnor <br />Environmental Supervisor <br />Mike Xuq <br />Colowyo Coal Company <br />Esecuare Diontor <br />5731 Highway 13 <br />Loretta E. Plmeda <br />Dlreclar <br />Meeker, CO 81641 <br />RE: Colowyo Coal Mine, C1981 -019, Permit Revision No. 3, Third Adequacy Review Letter <br />Dear Mr. Blunt: <br />The Division found Colowyo Coal Company, LLC's (CCC) application for a Permit Revision (PR3) <br />for mine expansion and mining in the Collom area complete on December 27, 2010. The Division <br />reviewed the application and provided CCC with a preliminary adequacy review on February 25, 2011. <br />CCC responded to the Division's preliminary adequacy concerns on March 28, 2011. The Division <br />reviewed CCC preliminary adequacy review responses and provided a second adequacy letter on April <br />22, 2011. CCC provided a second adequacy review response on May 23, 2011. The Division has the <br />remaining adequacy concerns as a result of our review of the second set of adequacy responses. <br />For the record, the original questions have been restated. The Division's review of CCC's first <br />adequacy response is in blue text. The Division's determination of CCC's response: adequate or <br />additional information required, is stated in gray text. <br />2.03.6 - General Requirements <br />1. On Rule 2 page 2, CCC makes the statement that "unleased and unassigned federal coal for <br />Little Collom X pit area is pending ". Since submitting the application, CCC personnel have <br />informed the Division that the permittee will not be acquiring this unleased coal. Rule <br />2.03.6(1) does not allow the Division to permit a mine plan the operator has not obtained the <br />right of entry. Please revise this paragraph to remove this statement. <br />CCC has removed the statement regarding unleased Federal Coal on Rule 2, page 2. This <br />response is acceptable. <br />Rule 2.04.3 — General Requirements: Site Description and Land Use Information <br />Office of Office of <br />.mm I ""d Denver • Grand lunction • Duraneo Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.