My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-27_REVISION - C1981022 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2011-06-27_REVISION - C1981022 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:34:54 PM
Creation date
7/6/2011 2:46:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
REVISION
Doc Date
6/27/2011
Doc Name
Revised Pages
Type & Sequence
TR72
Email Name
BFB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE Z 05.4 -T1 <br />SURFACE DISTURBANCE'SUMMARY <br />Area <br />Disturbance <br />(acres) <br />Reference <br />Drawing <br />Elk Creek Coal Handling, Support, and Ancillary <br />Facilities <br />39.0 <br />Map 2.05 -M1, General Facilities <br />Exhibit 2.05 -E1, Facilities Details <br />Sanborn Creek Mine Surface Facilities <br />4.1 <br />Map 2.05 -M1, General Facilities <br />Exhibit 2.05 -E1, Facilities Details <br />West Valley Coal Refuse Facility and Haul Road <br />12.9 <br />Map 2.05 -M1, General Facilities <br />Exhibit 2.05 -E4, Mine Development <br />Rock/Coal Refuse Facility <br />Elk Creek Mine Surface Facilities <br />(of total 8.6 is new and 15.6 is existing) <br />24.2 <br />Map 2.05 -M1, General Facilities <br />Map 2.05 -M3, Facilities Details <br />II West Coal Refuse Facility <br />8.8 <br />Map 2.05 -M1 General Facilities <br />Exhibit 2.05 -E4, Mine Development <br />Rock/Coal refuse Facility Designs <br />Satellite Facilities <br />Upper Hubbard Creek Facilities Area <br />3.3 <br />Map 2.05 -M1, General Facilities <br />Map 2.05 -E1, Facilities Details <br />Lower Hubbard Creek Facilities Area <br />2.6 <br />Map 2.05 -M1, General Facilities <br />Map 2.05 -E1, Facilities Details <br />Hubbard Creek Power Line Road <br />0.7 <br />Map 2.05 -M1, General Facilities <br />Exhibit 2.05 -E1 Facilities Designs <br />Bear Creek Facilities Area <br />3.0 <br />Map 2.05 -M1, General Facilities <br />Exhibit 2.05 -E1, Facilities Details <br />Water Treatment Plant Area <br />1.5 <br />Map 2.05 -M1, General Facilities <br />Sewage Effluent Absorption Field <br />0.3 <br />Map 2.05 -M1, General Facilities <br />Substation No. 3 and C -Gulch Ventilation <br />Installation <br />1.6 <br />Map 2.05 -M1, General Facilities <br />Coal Gulch Exploration Sites <br />0.4 <br />Map 2.05 -M1, General Facilities <br />Powerline Roads <br />17.0 <br />Map 2.05 -M1, General Facilities <br />Degas Well Sites (CBM -1- 15) and Roads <br />7.1 <br />Map 2.05 -M1, General Facilities <br />Elk Creek Mine Gob Vent boreholes and roads. <br />68.25 <br />Map 2.05 -M1, General Facilities <br />Bear Creek Shaft and Fan <br />2.3 <br />Map 2.05 -M1, General Facilities <br />Elk Creek Mine Exploration boreholes <br />3.91 <br />Exhibit 2.04 -E3, Item 8 Map <br />Subtotal — Satellite Facilities <br />111.96 <br />Map 2.05 -M1, General Facilities <br />Total <br />200.96 <br />Section - 2.05.4 <br />fences, etc.) until effective drainage can be reestablished. Any berms constructed to contain small <br />drainage areas will be revegetated and left in place. The vegetative cover will help to stabilize the <br />berms and over time the area on the uphill side of the berms will silt in completing the reclamation <br />process. Regrading operations will be limited to existing disturbance areas and those immediately <br />adjacent undisturbed areas necessary to provide for effective blending of regraded surfaces with the <br />surrounding terrain. Fugitive dust emissions will be controlled during reclamation by periodic <br />watering of roads and active reclamation areas. <br />Soil materials will be sampled following replacement to verify suitability and will be stabilized by <br />leaving the surface of the replaced soil in a roughened condition to minimize surface runoff and <br />erosion and promote moisture infiltration and through application of straw or native hay mulch <br />following seeding. <br />Soil samples will be analyzed for the parameters of pH, acid -base potential, saturation percent, <br />electrical conductivity, sodium adsorption ratio, selenium, boron, texture, nitrogen, phosphorus, and <br />potassium. Any necessary application of soil supplements or fertiliser will be based on soil analysis <br />results. <br />Revegetation success will be determined based on the results of revegetation monitoring. <br />Revegetation monitoring for reclaimed areas will occur in the third or fourth, ninth, and tenth year <br />following permanent seeding. In general, revegetation success will be evaluated based on the <br />parameters of cover, production and diversity by comparing monitoring data from reclaimed areas <br />TR -71, 72 <br />2.05 -50a Revised June 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.