Laserfiche WebLink
<br />P <br />mac <br />DIVISION of RECLAMINATION, MINING & SAFETY <br />-/Responses & Revisions Requested per communication <br /> <br />Dated April 18, 2011 <br />,-'A - / 9q6- 0 7? <br />?W N051 <br />I _ <br />Item #1 <br />Division of Water Resources <br />The run off in quarry hole will be pumped back out within the 72 hour limit. <br />Department of the Army <br />This is not an aquatic site. No lakes, ditches, marshes, etc will be affected. <br />Item #2 <br />Vegetation has already started coming back on exposed areas. But if this is not <br />sufficient some additional temporary seeding can be started. <br />All future top soil piles will use vegetative cove to stabilize them. <br />Lovington Blue Grama 1.0#/ac. @ 20% = .2#PLS/ac. <br />El Reno Side Oats Grama 4.5# @ 30% =.1.5#PLS/ac <br />Rosanna Western Wheat 8.0#/ac. @30% = 2.4#PLS/ac. <br />Lodorm Green Needlegrass 5.0#/ac. @ 20% =1.0#PLS/ac. <br />Item #3 <br />Approximately 20,000 cu yd <br />Item #4 <br />See revised Mining Plan Map E-3 <br />RECEIVED <br />APR 2 9 U JJ <br />IN plvialon of Reclamation, <br />Mining & Safety <br />See revised Mining Plan Map E-3 c n 6 4e r <br />Item #6&7 BQrnir- ? <br />All storm water that collects in the quarry hole will be pumped out within 72 hours an <br />allowed to flow away and or soak into soil naturally, per Division of Water Resources <br />Storm Water Plan. <br />Item #5 <br />Item #8 <br />The entire site will be graded to 3H:1 V or flatter through backfilling of the quarry pits. <br />Item #9 <br />The area along NE corner of affected area will be filled back in to a 3H:1V slope and <br />match the original natural slop of the area. <br />Item #10 <br />See revised Reclamation Plan Map for the location of access road after reclamation. <br />Item #11 <br />The current displaced material is approximately 20,000 cu yds. The Revised <br />Reclamation Plan (attached) clarifies this issue.