Laserfiche WebLink
o'.Co? COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />MINERALS PROGRAM INSPECTION REPORT <br />VIA/ \ <br />41 PHONE: (303) 866-3567 <br />1876 <br />The Division of Reclamation, Mining and Safety has conducted an inspection of the mining operation <br />noted below. This report documents observations concerning compliance with the terms of the permit <br />and applicable rules and regulations of the Mined Land Reclamation Board. <br />MINE NAME: MINE/PROSPECTING ID#: MINERAL: COUNTY: <br />Headley M-1980-135 Sand and gravel Morgan <br />INSPECTION TYPE: SPECTOR(S): INSP. DATE: INSP. TIME: <br />Monitoring ichael A. Cunningham March 30, 2011 16:30 <br />OPERATOR: OPERATOR REPRESENTATIVE: TYPE OF OPERATION: <br />Pinneo Feedlot, LLC Joel Chisum 112c - Construction Regular Operation <br />REASON FOR INSPECTION: BOND CALCULATION TYPE: BOND AMOUNT: <br />Normal I&E Program None $20,000.00 <br />DATE OF COMPLAINT: POST INSP. CONTACTS: JOINT INSP. AGENCY: <br />NA State Engr. (Water Resources) None <br />WEATHER: INS TOR'S SI NATURE: SIGNATURE DATE: <br />Clear Aril 13, 2011 <br /> <br />The following inspection topics were identified as having Problems or Possible Violations. OPERATORS <br />SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br />WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br />Possible Violation is indicated, you will be notified under separate cover as to when the Mined Land <br />Reclamation Board will consider possible enforcement action. <br />INSPECTION TOPIC: Hydrologic Balance <br />PROBLEM/POSSIBLE VIOLATION: Problem: The Division has no evidence that the operator has a valid well <br />permit, substitute water supply plan, or approved water augmentation plan for the exposed groundwater in <br />Gravel Pit No. 4. This is a problem related to 34-32.5-116(4)(h) of the Colorado Revised Statutes and 3.1.6(1)(a) <br />of the Construction Materials Rules and Regulations governing injury to existing water rights. <br />CORRECTIVE ACTIONS: The operator shall demonstrate that the operation is in compliance with the Office of <br />the State Engineer by the corrective action date specified. <br />CORRECTIVE ACTION DUE DATE: 5/16/11 <br />Page 1 of 4 <br />r <br />l?-