My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-04-06_REVISION - M1991037
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1991037
>
2011-04-06_REVISION - M1991037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:12:50 PM
Creation date
4/6/2011 2:58:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991037
IBM Index Class Name
REVISION
Doc Date
4/6/2011
Doc Name
Second Asequacy Review
From
DRMS
To
Destiny Mining, LLC
Type & Sequence
TR3
Email Name
AJW
DB2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />Iw o[ (0 z <br />J <br />6 April 2011 <br />COLORADO <br />D I V I S I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mr. Boyd Astemborski Mike King <br />Destiny Mining, LLC ? Executive Director <br />P.O. Box 51314 Loretta E. Pineda <br />Colorado Springs, CO 80949 Director <br />Re: Katuska Pit, Permit No. M-1991-037, Technical Revision TR-3; Second Adequacy <br />Review <br />Dear Mr. Astemborski: <br />The Division of Reclamation, Mining and Safety (Division) has reviewed the map referenced in our <br />first adequacy review for your Technical Revision TR-3 request. The Division needs you to <br />respond to the following remaining adequacy issues before TR-3 can be approved: <br />1) The TR states that when reclamation is finished it will be at 3:1 slope or flatter. Please describe <br />in the text and indicate on the Reclamation Plan Map which areas will be reclaimed to 3:1 slopes. <br />Include on the Reclamation Plan map the final slope configuration of the entire permit area. <br />2) The TR states that the pit will be backfilled with a mixture of sand and gravel. Please indicate <br />whether the source of the backfill material will be from inside the permit area or from off site. <br />3) Please provide the estimated water requirements of the project and the source of the water. <br />Be advised that you may not deviate from the existing Mining Plan until Technical Revision TR-3 <br />has been approved. You may call me with questions at (303) 866-3567 x8108. <br />Sincerely, <br />0, 4 ?- <br />David Bird <br />Division of Reclamation, Mining, and Safety <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.