My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-18_REVISION - M2007057
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2007057
>
2010-11-18_REVISION - M2007057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:10:28 PM
Creation date
3/31/2011 2:02:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007057
IBM Index Class Name
REVISION
Doc Date
11/18/2010
Doc Name
SO application (SO-01)
From
Navajo Development Co., Inc.
To
DRMS
Type & Sequence
SO1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
?J 11 ?l L Vl \..VLVl?! ?LJV <br />DIVISION OF RECLAMATION, MINING AND SAFETY _ pprl - 05'? <br />Department of Natural Resources <br />!? <br />1313 Sherman St., Room 215 'L' O ILA D O <br />C <br />Denver, Colorado 80203 DIVISION O F <br />Phone: (303) 866.3567 RECLAMATION <br />FAX: (303) 832-8106 MINING <br /> SAFETY <br />TRANSFER OF PERMIT AND SUCCESSION OF OPERATORS <br />APPLICATION FORM NOV 18 2010 <br />ammm of fiecMaNteiien, <br />ONiil/ end iMeiy <br />The application for a Transfer of Permit and Succession of Operators must contain four (4) major parts: 1) an Application Form; 2) <br />an Application Fee; 3) a Performance Warranty (attached as part of the Application Package) bearing the original notarized <br />signature of the Successor Operator; and, 4) a replacement Financial Warranty provided by the Successor Operator, bearing an <br />original notarized signature. To expedite processing, please provide the information in the format and order described below. <br />FINANCIAL WARRANTY INFORMATION (Choose ONE Option): <br />1. Option A: J k P' 4/-///0 1 wish to WAIVE MY RIGHT to a 30-day processing time to allow the <br />(Initial & Date) Division of Reclamation, Mining and Safety to recalculate the Financial <br />Warranty requirements. If you choose Option A you should not submit a <br />Financial Warranty and Performance Warranty until the Division notifies you <br />of the correct amount of your warranty requirements.* <br />2. Option B: I DO NOT WISH TO WAIVE MY RIGHT to a 30-day processing time. I <br />(Initial & Date) hereby submit a replacement Financial Warranty for the same dollar amount <br />as the Financial Warranty maintained by the current operator. I understand <br />that the Division of Reclamation, Mining and Safety will recalculate the <br />required reclamation bond within 60-days from the date that the transfer is <br />completed and the required FINANCIAL WARRANTY COULD BE <br />SUBSTANTIALLY INCREASED at that time. As the new operator, I agree <br />to be responsible for posting any required increase to the financial warranty <br />for good cause shown, in a form acceptable to the Board, within 60-days of <br />such notice. <br />0 <br />Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango <br />vmce of <br />Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.