Laserfiche WebLink
oF.Co <br />h <br />* 1876 <br />TM15ss <br />COLORADO DIVISION OF RECLAMATION, MINING ANDS ETY? <br />MINERALS PROGRAM INSPECTION REPORT R'CrIVW <br />PHONE: (303) 866-3567 ext. 8186 <br />MR14mi <br />VIPI 11(.,(IiJI I* <br />Mining and Safety <br />The Division of Reclamation, Mining and Safety has conducted an inspection of the mining operation <br />noted below. This report documents observations concerning compliance with the terms of the permit <br />and applicable rules and regulations of the Mined Land Reclamation Board. <br />MINE NAME: MINE/PROSPP.CTING ID#: MINERAL: COUNT <br />High Mesa Gravel Pit M-2000-067 ?? Sand and gravel Delta <br />INSPECTION TYPE: INSPECTOR(S): <br />1" INSP. DATE: <br />2011 <br />h 1 <br />M INSP. TIME: <br />13:00 <br />Monitoring Travis H. Marshall U/ , <br />arc <br />OPERATOR: OPERATOR REPRESENTATIVE: TYPE OF OPERATION: <br />Beavers Construction Co./High Mesa Gravel Wayne Toombs 112c - Construction Regular Operation <br />REASON FOR INSPECTION: BOND CALCULATION TYPE: BOND AMOUNT: <br />Normal I&E Program Complete Bond $17,000.00 <br />DATE OF COMPLAINT: POST INSP. CONTACTS: JOINT INSP. AGENCY: <br />NA U.S.BLM None <br />WEATHER: INSPECTOR'S SIGNATURE: SIGNATURE DATE: <br />Clear March 9, 2011 <br />The following inspection topics were identified as having Problems or Possible Violations. OPERATORS <br />SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br />WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br />Possible Violation is indicated, you will be notified under separate cover as to when the Mined Land <br />Reclamation Board will consider possible enforcement action. <br />INSPECTION TOPIC: Backfilling & Grading <br />PROBLEM/POSSIBLE VIOLATION: Problem: The site is utilizing off-site fill without prior approval by the <br />Division per 3.1.5(9) of the Rule. <br />CORRECTIVE ACTIONS: The operator shall provide a notarized affidavit, stating that the fill is, in fact, inert <br />and addressing all requirements pursuant to Rule 3.1.5(9), which describes the intended use of inert/off--site fill by <br />the corrective action date. <br />CORRECTIVE ACTION DUE DATE: 4/11/11 <br />INSPECTION TOPIC: Signs & Markers <br />PROBLEM/POSSIBLE VIOLATION: Problem: The affected area boundary markers are missing or <br />incorrectly placed. This is a problem for failure to maintain boundary markers around the affected area as <br />required by Section 3.1.12(2) of the rule. <br />CORRECTIVE ACTIONS: The operator shall conduct a survey and replace the boundary markers in the <br />correct location(s). The operator shall provide proof to the Division that this has been done by the corrective <br />action date. <br />CORRECTIVE ACTION DUE DATE: 4/11/11 <br />Pagel o176