My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01-26_REVISION - M2003037
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2003037
>
2011-01-26_REVISION - M2003037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:12:50 PM
Creation date
1/31/2011 11:06:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003037
IBM Index Class Name
REVISION
Doc Date
1/26/2011
Doc Name
Technical Revision approval (TR-03)
From
DRMS
To
Peter Kearl, Oldcastle SW Group, Inc.
Type & Sequence
TR3
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY' <br />Department of Natural Resources <br />1313 Sherman St., Room 215 COLORADO <br />Denver, Colorado 80203 D I V I S ION OF <br />Phone: (303) 866-3567 <br />8106 <br />R ECEIVIM RECLAMATION <br />MINING <br />FAX: (303) 832- <br />26 <br />2011 SAN 28 Z01 SAFETY <br />January <br />, <br /> DIVF3iun car NeC;arnatj0r? Hickenlooper <br />John W. <br />Peter Kearl ` I,4Ns10_4 0/0 44S-Ile S W Mining and Safety G <br />ve o <br />P.O. Box 3609 Mike King <br />Executive Director <br />Grand Junction, Colorado 81502 <br /> Loretta E. Pineda <br /> Director <br />Re: Haldorson Pit, Permit No. M-2003-037, Technical Revision, TR-03, Approval. <br />Dear Mr. Kearl, <br />The Division of Reclamation, Mining, and Safety (Division) has finished the review of United's request for a <br />Technical Revision (TR) for the above referenced permitted site. The technical revision request is noted as <br />adjusting the mine plan, movement of a portable asphalt batch plant on to the site, and re-alignment of the <br />entrance and haul roads. Additional information was supplied by United as requested on January 19, 2011. The <br />Division is approving TR-03 which: <br />1. Realigns interior haul roads and the access points to the pit within the permit area. <br />2. Removes all mine phasing. <br />3. Notes a portable asphalt plant will be moved on site for an extended period that is not defined. <br />The Division will be inspecting the site in the near future. A bond recalculation will need to be done to address the <br />total acreage disturbed and potential new acreage disturbance in any given year at that time. Please be advised <br />that without mine phasing, if no concurrent reclamation occurs the bond could potential increase every three <br />years. Also, as discussed, United needs to insure that all asphalt reject is cleaned up on a periodic basis and place <br />where there is no potential to rest in stormwater for more than 24 hours. Failure to abide by this request will <br />result in the requirement of another technical revision to formally adopt a cleanup plan to prevent potential <br />hydrological harm issues. <br />If you need additional information please contact me at the Division of Reclamation, Mining and Safety, Grand <br />Junction Field Office, 101 S. 3rd St., Suite 301, Grand Junction, Colorado 81501, or by telephone no. 970.241.1117. <br />Sincerely, <br />G. Russell Means <br />Environmental Protection Specialist II <br />Office of - Office of <br />Mined Land Reclamation Denver • Grand )unction Durango , Actwe and-Inoc?ive Ntiw-s
The URL can be used to link to this page
Your browser does not support the video tag.