My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-11-15_REVISION - M1980244 (111)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-11-15_REVISION - M1980244 (111)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:27 PM
Creation date
1/7/2011 2:23:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
11/15/2010
Doc Name
QA Monitoring and Test Results- 2010, VOL. II, Appendix D, Weekly Reports, Part 8.
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec'0 <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) S <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: February 6, 2010 <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Reporting Period: 1131110 through 2/6/10 <br />Days S M T W T F S <br />Work Shifts - D D D D D D <br /> - N N N N N - <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 13 °F to 21 °F (+/-) High: 27°F to 41 °F (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: No issues <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Clearing and Grubbing <br />1) VLF <br />Clearing and grubbing was performed at the East Cresson Clay Borrow using a CAT 330 <br />excavator, a CAT D-6 dozer and, two 40-ton haul trucks. Trees/slash was stockpiled in a <br />designated area within the clay borrow area. <br />B) Stripping <br />1) VLF <br />Topsoil stripping was performed at the East Cresson Clay Borrow using two CAT D8 dozers. <br />Topsoil was stockpiled temporarily and will be hauled to the permanent topsoil stockpile later. <br />C) Subgrade Preparation <br />1) VLF <br />No work performed during the week. <br />D) Slope Contouring <br />1) VLF <br />Slope contouring was performed in the following areas: between stations E3+00 (+/-) and <br />E8+00 (+/-), approximately 50 to 100 feet left of centerline; between station H20+00 (+/-) and <br />H26+00 (+/-), approximately 75 to 100 feet left of centerline; and between stations J15+00 <br />VLF Weekly Report WE 02.06.10.D.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.