Laserfiche WebLink
CLIMAX MOLYBDENUM COMPANY CLIMAX MINE <br />Lnltj A Subsidiary of Phelps Dodge Corporation <br />Hwy 91 <br />Climax, Colorado 80429 <br />(71914136-2150 <br />Fax (719) 486-2251 <br />April 17, 2007 <br />Certified Mail No.: 7001 1140 0002 9546 6880 <br />Mr. Allen Sorenson , <br />-ko Colorado Division of Reclamation, Mining and Safety LZ <br />1313 Sherman Street; Rm. 215 <br />Denver, Colorado 80203 L-? <br />RE: Climax Mine Building Demolition Notice V <br />Dear Allen: <br />During the construction season of 2007, Climax intends to initiate building/structural demolition <br />within the camp area of the site. The following buildings/structures will be demolished with <br />scrap salvage occurring where feasible (numbers correspond to the attached map): <br />• No. 5 Moly Warehouse <br />• No. 6 Drying Plant <br />• No. 10 P2S5 Building <br />• No. 17 Number 2 Crusher <br />• No. 18 Number 5 Crusher <br />Demolition activities will follow abatement of asbestos/hazardous materials. Neither treated <br />lumber nor timbers will be placed in the Climax Landfill per stipulations of the permit. All <br />demolition will take place on affected lands. <br />Climax is notifying the Division as a courtesy. If you have any questions or require additional <br />clarifications, please contact me at (719) 486-2150 ext. 723. <br />Sincerely, <br />4?7 4- <br />Gary A. Slifka <br />Sr. Environmental Engineer <br />Climax Molybdenum Company, Colorado Operations <br />Cc: J. Cupp <br />G. Stinnett