My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-05_INSPECTION - M2000082
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2000082
>
2010-10-05_INSPECTION - M2000082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:25:23 PM
Creation date
10/6/2010 7:14:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000082
IBM Index Class Name
INSPECTION
Doc Date
10/5/2010
Doc Name
Corrective Action Response
From
DRMS
To
Aggregate Industries WCR, Inc.
Inspection Date
3/31/2010
Email Name
JLE
AJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />October 5, 2010 <br />COLORADO <br />D I V I S I O N O F <br />RECLAMATION <br />MINING <br />SAFETY <br />Bill Ritter, Jr. <br />Governor <br />Connie N. Davis; Land Advisor Mike King <br />Executive Director <br />Aggregate Industries WCR, Inc. <br />P.O. Box 337231 Loretta E. Pineda <br />Director <br />Greeley, Colorado 80633 <br />RE: East 8th Street Operation; DRMS File No. M-2000-082. Corrective Action Response. <br />Dear Mrs. Davis, <br />The Division of Reclamation, Mining and Safety (Division) received your letter dated September 29, <br />2010. The Division reviewed the letter and has identified several issues that will need to be addressed in <br />order to consider the corrective actions resolved originally cited in the March 31, 2010 inspection report. <br />Ogilvy Ditch: <br />1.) The Division understands a signed agreement is in negotiation with the ditch company. Per your <br />request the Division will grant an extension to submit a signed notarized agreement for the Ogilvy Ditch <br />by October 30, 2010. <br />East 8th Street: <br />2.) A copy of the engineering evaluation conducted by Haley & Aldrich, Inc. is not on file with the <br />Division. If a structure damage reimbursement agreement cannot be obtained from CDOT, Aggregate <br />Industries will need to submit an updated engineering evaluation to account for the current stockpiling <br />activity at the site and the future mining plan per Rule 6.4.19 and Rule 6.5. The Division will give the <br />Operator until October 30, 2010 to submit either a notarized structure damage reimbursement agreement <br />or a technical revision for the engineering evaluation. <br />Greeley Gas Company Marker: <br />3.) Upon review, the Division concurs with your evaluation. Prior to affecting land within 200 feet of this <br />structure, the Operator must submit and receive approval of a notarized structure damage reimbursement <br />agreement from the Division. Or, Aggregate Industries must submit and receive approval of a technical <br />revision with an appropriate engineering evaluation indicating the structure will not be damaged by the <br />mining operation. <br />Ground Water Monitoring Plan Technical Revision: <br />4.) The Division approves your request for an extension to submit a technical revision for the updated <br />groundwater monitoring plan. Aggregate Industries must submit a technical revision by October 30, 2010 <br />as outlined in the body of the inspection report dated March 31, 2010. <br />Office of <br />Mined Land Reclamation <br />Denver • Grand Junction • Durango . t t <br />J e) <br />Office of <br />Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.