My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-10-04_REVISION - M1998034
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998034
>
2010-10-04_REVISION - M1998034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:55:59 PM
Creation date
10/5/2010 10:48:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998034
IBM Index Class Name
REVISION
Doc Date
10/4/2010
Doc Name
Reply to the Second Adequacy Review
From
Mountain Park Concrete Inc.
To
DRMS
Type & Sequence
CN1
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All, <br />A,IIWI?J?Atl ll?ll? o L?17'0 <br />P.O. Box 856 <br />Granby, CO 80446 <br />Phone: (970)887-3444 <br />Fax: (970)887-0993 <br />Email: mtnparkconcreteOxmail.com <br />October 3, 2010 <br />Department of Natural Resources <br />1313 Sherman St. Room 215 <br />Denver, Colorado 80203 <br />W <br />OCT 0 4 2010 <br />Dmwon of Rear, <br />//" <br />Dear Mr. Peter Hays, <br />RE: Mountain Park Concrete Inc.; File No. M-1998-034 Parshall Pit; 112c Permit Conversion Application; <br />/epiy to the second adequacy revi w concerns dated September 28, 2010. The applicant will answer ques- <br />tions in the same order as you asked. <br />6.4.4. Exhibit D - Mining Plan <br />1. The applicant commits to submitting a technical revision to the permit, per Rule 1.9, to provide the Divi- <br />sion design specifications regarding the crossing construction prior to initiating construction of the drainage <br />crossing. <br />6.4.5 Exhibit E - Reclamation Plan <br />2. The applicant commits to salvaging a minimum of 28,100 cubic yards of topsoil for reclamation of the <br />Parshall Pit. <br />6.4.12 Exhibit L - Reclamation Costs <br />3. Division should be able to re-estimate the cost to reclaim the site know that the applicant has addressed <br />all of the concerns regarding the amount of required topsoil required for reclamation for the Parshall Pit. <br />Thank you for your concern on this matter and we believe all concerns have been addressed and the applica- <br />tion is complete and ready for review on October 6, 2010. Please notify us of scheduled review time on Oc- <br />tober 6, 2010. <br />Sincerely, <br />Joe Docheff <br />Mountain Park Concrete Inc. Vice President
The URL can be used to link to this page
Your browser does not support the video tag.