My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-22_ENFORCEMENT - M1988037
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M1988037
>
2010-09-22_ENFORCEMENT - M1988037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:23:17 PM
Creation date
9/29/2010 8:00:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988037
IBM Index Class Name
Enforcement
Doc Date
9/22/2010
Doc Name
Response to Inspection Report
From
United Companies
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f, j - f <br />ITID4PANIES <br />4Y <br />A9G•? OP?gO.P?~ <br />&ie? <br />P.O. Box 3609 <br />2273 River Road <br />Grand Junction, CO 81502 <br />(970) 243-4900 <br />FAX: (970) 243-5945 <br />P.O. Box 1909 <br />21830 Hwy. 550 South <br />Montrose, CO 81402 <br />(970) 249-1815 <br />FAX: (970) 240-8497 <br />P.O. Box 103 <br />7255-1800 Rd. <br />Delta, CO 81416 <br />(970) 874-9759 <br />FAX: (970) 874-8326 <br />P.O. Box 1556 <br />27858 Hwy 6 & 24 <br />Rifle, CO 81650 <br />(970) 625-3738 <br />FAX: (970) 625-5605 <br />Se' <br />September 13, 2010 <br />SEP 2 2 2010 <br />Russell Means GRAND JUIe-i!Uii"i HELD OFFICE <br />Di'vi ,ION OF <br />Division of Reclamation, Mining and Safety RECLM4ATiON MINING & SAFETY <br />101 South 3`d Street, Room 301 <br />Grand Junction, CO 81501 <br />RE: Response to Inspection Report Permit Numbers M-1988-037 <br />Dear Mr. Means: <br />Attached are photos showing the permit boundary in question at the Norwood Pit. The section corner <br />was located and used to determine the proper location of the southern permit boundary. The existing <br />permit signs are at the proper locations. Consequently, the safety berm was moved to the north as <br />shown in the photos. <br />We plan to have our hydroseeder available the first of October to seed the topsoil stockpiles as required <br />in your inspection report. If you have any questions, please let me know. <br />Thank you for your time and consideration. <br />Best Regards, <br />?? 'e4 -X <br />Peter M. Kearl <br />Resource / Environmental Manager
The URL can be used to link to this page
Your browser does not support the video tag.