My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-19_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2010-08-19_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:19:27 PM
Creation date
8/20/2010 10:05:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
REVISION
Doc Date
8/19/2010
Doc Name
Letter, Application, & Public Notice (Emailed)
From
Twentymile Coal Company
To
DRMS
Type & Sequence
TR75
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Peabody <br />Twentymile Coal Company <br />Mr. Jason Musick <br />Environmental Protection Specialist <br />Colorado Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />(303) 866-3567 X1834 <br />29515 Routt County Road #27 <br />Oak Creek, CO 80467 <br />970.879.3800 <br />RECOV8D <br />AUG 19 2010 <br />Uwlalurl UI KKIaawmon, <br />Mining and SakRY <br />August 19, 2010 <br />RE: Twentymile Coal, LLC - Foidel Creek Mine (Permit No. C-82-056), Technical Revision (TR10- <br />75) for Security Gate Drainage Modifications <br />Dear Mr. Musick: <br />Twentymile Coal, LLC (TC) requests CDRMS approval of a Technical Revision (TRIO-75) to the <br />approved Permit, for drainage modifications to the Security Installation previously permitted as MR09- <br />240 and MR10-244. The proposed modifications involve installation of a grated collection basin on the <br />south side of the Security Building and a 36-inch culvert extending under the Mine Access Road to <br />connect with existing ditch G-2. The limited drainage from this small area was previously collected and <br />routed to either Pond G by Ditch G-Id (the majority of the drainage), or Pond D by Ditch D-4. <br />Because the Security Installation, and proposed drainage modifications will be located within an existing <br />disturbance area, there will be no new disturbance associated with the project. Associated reclamation <br />requirements and costs will be limited to removal of the drainage collection basin and culvert as <br />summarized by the accompanying Reclamation Cost Estimate.. Backfilling and grading, soil <br />replacement, and revegetation, are already addressed for this area by the previously approved revisions for <br />the Mine Access Road (MR03-184), Parking Area (MR07-220), and Security Installation (MR09-240). <br />This submittal includes revised PAP text and supporting materials, as identified by the attached Summary <br />of Revisions/Additions, and a project bond estimate. TCC would like to proceed with this project as soon <br />as possible, therefore we appreciate your consideration and cooperation in facilitating timely review and <br />approval. Once you have had opportunity to review the accompanying information, please feel free to <br />contact me with any questions or to discuss related matters. <br />Best regards, <br />Twentymile Coal Company <br />Jerry M. Nettleton <br />Environmental Manager <br />cc: Mike Berdine/TCC <br />Jerry Nettleton/TCC <br />C:\jdm\Sites\Foidel Creek\Revisions\TR75\TR10-75 Security Gate Drainage Mods TL.doc
The URL can be used to link to this page
Your browser does not support the video tag.