Laserfiche WebLink
t,-V-('0'M'P'" COAL <br />ANYL.L.C. <br />A Subsidiary of Arch Westem Muminous Group, LLC <br />August 04, 2010 <br />Mr. Tom Kaldenbach <br />Colorado Division of Reclamation, Mining and Safety <br />Office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />West Elk Mine <br />P.O. Box 591 <br />5174 Highway 133 <br />Somerset, CO 81434 <br />(970) 929-2200 <br />Fax (970) 929-5050 <br />RECMW D <br />AUG 0 5 2010 <br />k`irii,10 and Sakty <br />Re: Mountain Coal Company, LLC, West Elk Mine; Permit No. C-1980-007; Minor <br />Revision No. MR-368, Addition of Phased Construction Drawing to Exhibit 82 <br />Dear Mr. Kaldenbach: <br />Mountain Coal Company, LLC (MCC) submits this letter, application form and the "RPE East <br />Construction, Buttress Section and Details" drawing for Minor Revision No. 368 (MR-368) to its <br />Mining and Reclamation Permit No. C-1980-007. This revision is to add this construction <br />drawing to Appendix D of Exhibit 82 (after drawing C-04) to document that the approved <br />buttress as designed per TR 120 will be constructed in phases. The approved buttress design <br />remains the same as approved and is not changed by this construction detail. <br />Please contact me at (970) 929-2238 or by e-mail should you have questions regarding this <br />submittal. <br />Sincerely, <br />Ka h een G. Welt, <br />Environmental Engineer III <br />cc: Doug Nolte - MCC <br />Joanne Williams - Gunnison Co.