My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-03_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2010-08-03_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:25 PM
Creation date
8/5/2010 1:29:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
8/3/2010
Doc Name
Request for changes in Soil Liner Fill ("SLF") % Fines from the current 50% to 65%.
From
DRMS
To
CC&V
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION OF RECLAMATION,MINING AND SAFETY <br />COLORADO' <br />D I V I S ION '0F <br />RECLAMATION. <br />MINING <br />SAFETY <br /> Bill Ritter, Jr. <br /> <br />Mr. Timm Comer Governor <br />Manager: Environmental Resources Mike King <br /> Executive Director <br />Cripple Creek and Victor Gold Mining Co <br />P.0.13ox191 Loretta E. Pineda <br /> Director <br />Victor; £olorado:80860 <br />Re:; Permit # M=1980-244, Cresson Project, AM #9, Request for changes in Soil Liner,Fi.ll ("SLF") % Fines <br />from the current 50% to 65 %. <br />Dear Mr. Comer, <br />The bivision ;has reviewed your request to change the percent fine specification from the 5-% to 65 %. <br />The'Dlvision has;revewed the additional supplemetal information that was requested after our meeting <br />on site on July 14 2010 from Dr. John Lupo, the design engineer for the project. <br />As part of tho,a'pproval, the Division and CC&V have agreed to increase the compaction. testing of the <br />SLF from the current 5,000 cubic yards to 4,000 cubic yards. The increased frequency of testing will be <br />applicable to aII:SLF; that is expected to be placed in the Phase V valley leach facility, until a satisfactory <br />length of time demonstration of the results are reviewed by the Division as part of the weekly QA/QC <br />submittal; and 4 written request to change the frequency is approved by the Division. <br />You may now. commence with the requested change in fines for the Soil Liner Fill. If you have questions, <br />Office of <br />Mined Land Reclamation Denver a Grand Junction a Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.