My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-30_INSPECTION - M1999018
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1999018
>
2010-06-30_INSPECTION - M1999018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:14:13 PM
Creation date
7/6/2010 9:11:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999018
IBM Index Class Name
INSPECTION
Doc Date
6/30/2010
Doc Name
Inspection report
From
DRMS
To
Wagner Construction, Inc.
Inspection Date
6/7/2010
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r? 0 6 2010 <br />oF'Coco COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY0eVmK)iI of R--c1Q 1h <br />MINERALS PROGRAM INSPECTION REPORT r'd '* <br />* PHONE: (303) 866-3567 <br />* 1876. <br />The Division of Reclamation, Mining and Safety has conducted an inspection of the mining operation noted <br />below. This report documents observations concerning compliance with the terms of the permit and <br />applicable rules and regulations of the Mined Land Reclamation Board. <br />MINE NAME: MINE/PROSPECTING ID#: MINERAL: COUNTY: <br />Wagner Rock M-1999-018 SDG; STN Moffat <br />INSPECTION TYPE: INSPECTOR(S): INSP. DATE: INSP. TIME: <br />Monitoring Dustin M. Czapla June 7, 2010 12:00 <br />OPERATOR: OPERATOR REPRESENTATIVE: TYPE OF OPERATION: <br />Wagner Construction, Inc. Jay Wagner, The Wagner Corporation 110c - Construction Limited Im act <br />REASON FOR INSPECTION: BOND CALCULATION TYPE: BOND AMOUNT: <br />Normal I&E Program Complete Bond $8,740.00 <br />DATE OF COMPLAINT: POST INSP. CONTACTS: JOINT INSP. AGENCY: <br />NA one None <br />WEATHER: IN-SPEC-VQR1S SIGNATURE: SIGNATURE DATE: <br />Clear June 30,2010 <br /> <br />The following inspection topics were identified as having Problems or Possible Violations. OPERATORS <br />SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br />WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a Possible <br />Violation is indicated. you will be notified under separate cover as to when the Mined Land Reclamation <br />Board will consider possible enforcement action. <br />INSPECTION TOPIC: Financial Warranty <br />OBSERVATIONS: <br />PROBLEM/POSSIBLE VIOLATION: Problem: The financial warranty is not adequate to reclaim the site in accordance with the <br />approved reclamation plan. This is a failure to maintain the proper financial warranty amount to complete reclamation of the affected <br />lands pursuant to C.R.S. 34-32.5-117(4)(b) of the Act. <br />CORRECTIVE ACTIONS: The operator shall submit adequate financial warranty, as determined by the Division. The Division will <br />be sending a separate surety increase notice to the operator regarding the increase of the financial warranty. The operator will have 60 <br />days from the date on the surety increase notice to post the additional financial warranty. <br />CORRECTIVE ACTION DUE DATE: 8/30/2010 <br />Page I 1
The URL can be used to link to this page
Your browser does not support the video tag.