Laserfiche WebLink
IV <br />5.2 /1 MS <br />/ 40 I I 32.5' DAM EMBANKMENT CELL D2 <br />r EX EL: 4735.5' <br />DAM EL: 4768' <br />1 215 <br />29.5' DAM EMBANKMEN <br />\ EX EL: 4738.5' <br />sz <br />DAM EL. 4768 <br />\ CELL C2 <br />`' \�3:1 <br />Vj <br />/. i -0 k.. <br />61 ' <br />1� <br />11 <br />—NEW PERMIT BOUNDARY <br />S 1 _ <br />NORTH <br />0 250 500 <br />1' =500' <br />( IN FEET ) <br />LEGEND <br />NEW PERMIT BOUNDARY <br />\ OLD PERMIT BOUNDARY <br />FLOODWAY <br />/ PROPOSED CONTOUR <br />THESE MAPS WERE PREPARED BY CIVIL RESOURCES, LLC IN COOPERATION WITH GILCREST GAS LINE <br />— <br />GAS LINE <br />SLURRY WALL <br />RESERVOIR, LLC AND PLATTE SAND & GRAVEL, LLC. PLATTE SAND & GRAVEL, LLC WILL KEEP THE '� MINING DIRECTION %13:1 <br />DIVISION OF RECLAMATION, MINING AND SAFETY APPRISED OF ANY CHANGES TO THE MINING OR <br />RECLAMATION PLAN THROUGH ANNUAL REPORTS AND WILL FILE TECHNICAL REVISIONS AND <br />RESEEDED AREAS <br />AMENDMENTS APPLICATION AS NE Y THROUGHOUT THE LIFE OF THE MINE. CIVIL RESOURCES, <br />LLC IS NOT RESPONSIBLE FOR j�{�/� R ABOUT THE PROJECT SIT NOR FOR COMPLIANCE BY v <br />THE APPROPRIATE PARTY O IT I� ETO- Z <br />CIVIL RESOURCES, LLC <br />NOTES: O��'J'S /ANAL- �,�\`,c, <br />1. THE SLURRY WALL AND EMBANK S WILL BE INSTALLED BEFORE MINING OCCURS IN THE AREAS THAT HAVE NOT YET BEEN <br />MINED. THE EMBANKMENTS WILL BE CREATED FROM THE OVERBURDEN ON THE PROPERTY. THE TOPSOIL WILL BE PRESERVED <br />AROUND THE PERIMETER OF EACH RESERVOIR AND PLACED ON THE DOWNSTREAM EMBANKMENT AND SEEDED AFTER <br />CONSTRUCTION IS COMPLETE, <br />2. THE LANDOWNER MAY FILL THE RESERVOIRS BEFORE MINING IS COMPLETE. <br />3. FILLING OR PLACEMENT OF MATERIALS ADJACENT TO THE RIVER WILL NOT BE ALLOWED INSIDE OF THE FLOODWAY LIMIT. <br />4. NO MINING OR RECLAMATION MAY OCCUR WITHIN THE BALD EAGLE BUFFER ZONE BETWEEN NOVEMBER 1 AND MARCH 1. <br />