My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-27_REVISION - M1996052
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1996052
>
2010-04-27_REVISION - M1996052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:22:42 PM
Creation date
4/27/2010 2:49:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996052
IBM Index Class Name
REVISION
Doc Date
4/27/2010
Doc Name
Adequacy Response #1
From
Environment, Inc.
To
DRMS
Type & Sequence
AM1
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A-® <br />Ei)virppnqept,. IIQC, <br />LARRY E. O'BRIAN 7985 VANCE DRIVE, SUITE 205A <br />FOUNDER <br />ARVADA, COLORADO 80003 <br />303-423-7297 <br />FAX 303-423-7599 <br />April 26, 2010 <br />Mr. Eric Scott <br />Division of Reclamation, Mining & Safety <br />1313 Sherman St., #215 <br />Denver, CO 80215 <br />Dear Eric; <br />ECEIVE?D <br />RE: L.G. Everist, Inc. <br />Firestone Gravel Resource, Permit # M-1996-052 APR 2 72010 <br />,.-Adequacy Response #1 <br />Division or Kectamation, <br />Mining and Safety <br />on behalf of our client L.G. Everist, Inc., I will respond to <br />your February 2nd, 2010 adequacy review letter in the order and <br />number format presented in that document. <br />Exhibit C - Pre-Mining and Mining Plan Maps (Rule 6.4.3) <br />Please show the locations, construction details, and dimensions (LxWxH) of any structures and founda- <br />tions/pads to be placed on the site as discussed in the mining plan including: conveyor systems, scale, <br />sales buildings, concrete batch and casting plants and asphalt batch plant and all associated supporting <br />features. A Technical Revision will be required at a later date to add any of these structures/features and <br />provide details not specifically included at this time. There will also be bonding implications for the removal <br />of any structures placed on-site. <br />Since resumption of mining is delayed for the next couple of <br />years the planning and location of the support facilities you <br />listed are unknown at this time. The scale and scale <br />house/sales building are shown on these 2 maps, north of the <br />ditch along the west side. In general, the asphalt and <br />concrete batch plants and the casting facility will be north <br />of the scale. The conveyor will be in various locations <br />extending from the existing Plant Site into the mining areas <br />and that will change as mining progresses. We have included <br />the cost to remove any concrete foundations of support <br />structures for the Concrete and Asphalt plants, the processing <br />plant, and Scale/Scale house in the revised bond estimate. <br />The demolition numbers are based on typical foundations.found <br />at other sites we have. <br />It is the Division's understanding at this time that topsoil and overburden piles, while not located <br />specifically on the map, will be placed within the setback of the active area(s), located no more than 900 <br />feet from the active mining area, and fully within the permitted area as stated elsewhere in the application. <br />Please confirm. <br />We confirm our plan to located the topsoil and overburden pile <br />as described in the text. Map Exhibit C-1 shows topsoil and
The URL can be used to link to this page
Your browser does not support the video tag.