Laserfiche WebLink
C - 8' -v /S <br />FRUITA/AMERICAN SHIELD PROJECT <br />Bond Revocation Permit #C81 -015 <br />Closeout Report <br />December 11, 2000 <br />PROJECT OVERVIEW <br />The Fruita Mine Project area is located 10 miles north of Fruita in Mesa County. Situated in the <br />Bookcliffs, the elevation of the work area is approximately 5,000 feet. The project consisted of one <br />mine site requiring reclamation work. <br />The area in which the project was located had been mined by underground methods creating an <br />overcast slope from a bench cut. Reclamation work included in this project was initiated as a result <br />from an estimated 100 year storm event which severely eroded an overcast slope which was <br />previously revegetated within another bond forfeiture project in 1996. The project consisted of the <br />construction of an erosionally stable drainage way through the bench and slope areas, the <br />recontouring of the main access road, and the revegetation of the regraded areas. Construction was <br />performed under two separate periods with the later period consisting of late fall reseeding. Paul <br />Krabacher was the Project Manager for the project. <br />II. LANDOWNER CONSENT <br />Landowner notification was made through the Coal Section's Reclamation Specialist's <br />correspondence. Communication with the landowner included making him aware of the differing <br />reclamation technique of establishing a drainage through the overcast slope as a result of an <br />estimated 100 year flood rather than trying to manage the site's hydrology through run -on and <br />run -off control structures. <br />III. CONSTRUCTION <br />PKA -0 -455 Fruita Mine/ American Shield Bond Forfeiture Project <br />Advertisement for Bid Dates: <br />Pre -bid Meeting Date: <br />February 17, 2000 <br />Bid Opening Date: <br />March 2, 2000 <br />Number of Bids: <br />8 <br />Notice of Award Date: <br />March 3, 2000 <br />Contract Number <br />C- 188202 <br />Low Bid Amount: <br />$ 19,944.00 <br />Total Contract Cost <br />$ 23,194.00 <br />Mulch delivery (not in contract) <br />$ 440.00 <br />Total Project Cost <br />$ 23,634.00 <br />Notice to Proceed Date: <br />April 14, 2000 <br />Start Date: <br />April 14, 2000 <br />Construction Completion Date: <br />May 30, 2000 <br />Reseed Date: <br />November 28, 2000 <br />Days for Construction: <br />46 <br />