Laserfiche WebLink
INTEROFFICE MEMORANDUM <br />Date: 04 March 2010 <br />To: Joseph J. Dudash, Lead Specialist <br />From: Marcia L Talvitie, P.E. <br />Subject: Bowie No. 2 Mine - Permit No. C-1991-083 <br />TR-65 - Amend B-Seam Mine Plan and Add Geotech Hole <br />Geotechnical Adequacy <br />I have reviewed BRL's response to the adequacy issues listed in my preliminary review <br />letter to you dated the 8th of January. The original TR-65 application included a March <br />2004 study prepared by Maleki Technologies, Inc. ("MTI 2004") entitled "Overburden <br />Stability Evaluation at Terror Creek Crossing". The adequacy response package included <br />an updated report from Maleki, bearing the same title, dated January 2010 ("MTI 2010"). <br />My comments updating each of my original adequacy items are presented in bold type <br />below. Items have been numbered to match the system used in your Preliminary <br />Adequacy Review letter. <br />MTI 2004 Section 2.0 - Data Collection Program <br />14. Three geotechnical holes were drilled, and are illustrated on Figure 1. The <br />locations of these three holes with respect to one another differ from what is <br />shown on Map 09. Please verify that locations shown on Map 09 for <br />geotechnical holes TC-03-01, TC-03-02 and TC-03-03 are accurate, and revise if <br />necessary. <br />Locations shown on Map 09 were correct; MTI 2010 Figure la was revised <br />accordingly. Item resolved; no additional response is required. <br />15. Page 6 of MTI 2004 states that holes TC-03-02 and TC-03-03 "were drilled <br />directly above the projected location of the mains." TDR cables were cemented <br />in all three holes (see Page 8), providing a means of "identifying the location of <br />bed separation and shearing along the entire overburden." With the new proposed <br />location of the West Mains, the TDR cables installed previously would not seem <br />to be able to provide BRL with the same level of information. However, revised <br />pages 2.05-120 and -125 describe and list four subsidence monuments proposed