My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-21_REVISION - C1996083 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2008-02-21_REVISION - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:23:06 PM
Creation date
2/11/2010 2:51:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
2/21/2008
Doc Name
Email Regarding Submittal
From
Jim Stark
To
Joe Dudash
Type & Sequence
TR53
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dudash, Joe <br />From: Stark, Jim <br />Sent: Thursday, February 21, 2008 12:37 PM <br />To: Dudash,Joe <br />Subject: RE: Bowie No. 2 MR-86 and TR-53 <br />OK, will do. Thanks. <br />From: Dudash, Joe <br />Sent: Thursday, February 21, 2008 12:03 PM <br />To: Stark, Jim <br />Cc: Brown, Sandy <br />Subject: RE: Bowie No. 2 MR-86 and TR-53 <br />I talked to Jim Stover. Bowie still wants to proceed with TR-53 as submitted. Permitting wise, MR-86 doesn't affect TR-53 <br />at all. Bowie wants to keep their options open at this time. So please continue to work on TR-53 and bond for both wells. <br />Thanks! <br />From: Stark, Jim <br />Sent: Thursday, February 21, 2008 10:51 AM <br />To: Dudash, Joe <br />Cc: Brown, Sandy <br />Subject: Bowie No. 2 MR-86 and TR-53 <br />Joe, <br />I placed a reclamation cost estimate for the Bowie No. 2 Mine's MR-86 in your in-box. This estimate is for the <br />monitoring well into the D-Seam workings to determine if there is any water present. This well is, apparently, the well <br />that Bowie has also requested approval for in TR-53. It is my assumption that the estimate for the well in MR-86, at this <br />time, satisfies the bonding requirement for the well requested in TR-53. If this is not correct, please let me know. <br />In TR-53, BRL states that they may drill an additional dewatering well (in addition to the monitoring well), install a <br />pump at the well and run pipe from the well, under the Hubbard Creek road, down to Hubbard Creek. I have not <br />completed an estimate for this work at this time. Do you want me to complete this estimate or is the Division going to <br />wait and see if Bowie encounters any water in the D-Seam prior to completing TR-53? Please let me know how you want <br />me to proceed at this point. Thanks. <br />James R Stark <br />Environmental Protection Specialist <br />Department of Natural Resources <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />(303) 866-4929 <br />www.mining.state.co.us
The URL can be used to link to this page
Your browser does not support the video tag.