Laserfiche WebLink
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />001 -Final Grading of Benches airtools 1 40.0 $3,599 <br />002 -Replacing Topsoil loader 1 83.4 $7,419 <br />003 -Revegetation of Disturbed Areas revege 1 16.0 $13,72 <br />6 <br />004 -Equipment Mobilization/Demobilization mobilize 1 7.0 $1,491 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 146.4 $26,235 <br />* includes inflation factor adjustment of : NA % TOTAL DIRECT COST' =1_$26,235 <br /> <br /> <br />..... <br />::::::::::::::::::.... . . <br />......... <br />INDIRECT COSTS <br /> <br />.... ........ <br />OVERHEAD AND PROFIT - Liability insurance : 2.02 % of direct total = $530 <br />Performance bond : 1.05 % of direct total = $275 <br />Job superintendent : NA" NA NA total = NA <br />Profit : 10.00 % of direct total = $2,624 <br />not required (or eqp. operator serves as super.) TOTAL 0 & P = $3,429 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct + 0 & P) = $29,664 <br />Financial warranty processing (legal/related costs) : 0.00 total $ NA total = $0 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $1,483 <br />CONTINGENCY - NA" NA total = NA <br />`contingencies accounted for at task level TOTAL INDIRECT COST = $4,912 <br />TOTAL BOND AMOUNT (direct + indirect) _ $31,147