My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-11-27_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2007-11-27_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:18:49 PM
Creation date
2/8/2010 2:35:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
11/27/2007
Doc Name
Revised Page Letter
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
MR84
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER & ASSOCIATES, INC. <br />P.O. BOX 60340 <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (970) 245-4101, FAX 242-7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />November 20, 2007 <br />J. J. Dudash <br />Division of Reclamation, Mining & Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Bowie Resources, LLC, Bowie No. 2 Mine <br />Store Shaft Pad Topsoil in Stockpile F <br />Minor Revision No. 84 <br />Permit C-1996-083 <br />Dear Mr. Dudash: <br />RECE?vE? <br />Nod 2? 2??? <br />a dsaeHn, <br />D??`son of <br />N;;?,n9 <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />The DRMS processed a Field Decision Form - Minor Revision dated November 16, <br />2007. The revision was processed to provide for the temporary storage of topsoil and <br />topsoil like material from the Hubbard Creek vent shaft site at the unit train loadout <br />topsoil stockpile. Revised permit application pages and maps describing the topsoil <br />storage project are to be submitted to DRMS by November 28, 2007. On behalf of <br />Bowie Resources, LLC, enclosed are amended page 2.05-38 and Map 39. <br />The second to the last paragraph on page 2.05-38 was amended to state the topsoil <br />from the shaft construction site will be hauled to stockpile "F" located near the unit train <br />loadout. The note regarding plating the cut slope with topsoil was removed from Map <br />39. <br />Sincerely, <br />J.E. Stover, PE <br />Consulting Engineer
The URL can be used to link to this page
Your browser does not support the video tag.