Laserfiche WebLink
s <br />emit No. C -92 -080 <br />ne name: Carbon Junction Mine <br />TASK LIST (DIRECT COSTS) <br />Task no. Task description <br />Colorado Division of Reclamation, Mining and Safety Geology <br />Reclamation Cost Estimate <br />Prepared by: TK <br />Permit or job action: Permit Renewal RN -03 <br />60% of <br />applicable <br />Forth Task Cost (SL- amount for <br />Used Hours 03) SL -03 ($0 <br />outside SL- <br />03 area) <br />Date: <br />Unfinished work or <br />finished work yet to be <br />bond released <br />08/06/08 <br />Finished, partially bond <br />released work subject to <br />3.03(2) bond release phase <br />limits <br />Cost (RN -03) Hours Cost (RN -03) Hours <br />North pit <br />001 <br />Bring down -cast spoil from slope of N. Pit up to bench at N. Pit <br />excavate <br />19.78 <br />$2,762 <br />002 <br />Cut spoil at base of North Pit scarp, then push to pit <br />dozer <br />64.19 <br />$13,373 <br />003 <br />Move boulders/cobbles on N. Pit bench to inside edge of bench <br />dozer <br />26.00 <br />$5,417 <br />004 <br />Haul fill from PRSA to North Pit <br />truck/loader <br />88.51 <br />$47,839 <br />005 <br />Regrade North Pit fill to final contour <br />dozer <br />121.13 <br />$25,236 <br />006 <br />Haul &spread topsoil fill & growth medium f/ t.s. pile #2 to N. Pit <br />scraper2 <br />215.29 <br />$43,321 <br />007 <br />Final -grade topsoil on North Pit <br />dozer <br />348.99 <br />$72,709 <br />008 <br />Revegetate North Pit <br />revege <br />16.70 <br />$6,333 <br />009 <br />Construct 3 ponds <br />TR -12 est. <br />18.00 <br />$7,500 <br />010 <br />Compact N. Pit fill (most fill is topsoil with some blasted rock) <br />compact <br />66.56 <br />$4,734 <br />Applicable amount <br />$229,224 <br />$137,534 <br />North pit haul road topsoil stockpile #2 and permanently reclaimed spoil area (PRSA) <br />012 <br />Haul fill from PRSA to North Pit haul road <br />truck/loader <br />11.06 <br />$5,622 <br />013 <br />Grade North Pit haulroad fill <br />grader <br />7.10 <br />$779 <br />014 <br />Haul topsoil from topsoil stockpile #2 to North Pit haul road <br />scrape2 <br />3.32 <br />$2,409 <br />015 <br />Regrade PRSA to final contour <br />grader <br />3.46 <br />$380 <br />016 <br />Regrade topsoil stockpile #2 <br />grader <br />2.07 <br />$227 <br />017 <br />Revegetate North Pit haul road, footprint of t.s. #2, PRSA <br />ravage <br />18.50 <br />$9,417 <br />$18,834 <br />$11,300 <br />South pit drill pad <br />018 <br />Regrade South Pit drill pad <br />dozer <br />11,29 <br />$2,353 <br />019 <br />Haul topsoil from stockpile #2 to South Pit drill pad area <br />scrape2 <br />6.39 <br />$4,626 <br />020 <br />Finish -grade South pit drill pad <br />grader <br />2.69 <br />$145 <br />021 <br />Revegetate 3.5-acre South Pit drill pad <br />ravage <br />7.00 <br />$2,655 <br />$9,781 <br />$5,869 <br />Carbon Junction Canyon channel <br />022 <br />Regrade C.J. Carry. Channel f/ 1962' to 922' per TR -12 profile <br />dozer <br />3.08 <br />$642 <br />023a <br />Excavate C.J. Canyon channel - hard digging <br />excavate <br />30.88 <br />$4,000 <br />023b <br />Excavate C.J. Channel - easy digging <br />excavate <br />28.59 <br />$3,992 <br />024 <br />Purchase filter rock and rock nprap for C.J. channel <br />spreadsheet <br />24.00 <br />$79,882 <br />025 <br />Install filter and dprap in C.J. Canyon channel <br />excavate <br />173.00 <br />$24,185 <br />026 <br />Purchase culvert for C.J. Canyon channel road crossing <br />TR -12 est. <br />8.00 <br />$9,903 <br />027 <br />Install culvert where channel crosses road <br />TR -12 est. <br />24.00 <br />$7,000 <br />028 <br />Surveying <br />TRA2est. <br />16.00 <br />$4,500 <br />$134,104 <br />$80,462 <br />Sediment pond #2 <br />031a <br />Haul topsoil for fill & reveg. f/ stockpile #7 to pond #2 <br />truck/loader <br />31.27 <br />$6,788 <br />$6,788 31.27 <br />031b <br />Regrade pond #2 fill <br />dozer <br />7.86 <br />$1,638 <br />$1,638 7.86 <br />031c <br />Install riprap in drainage channel at pond #2 <br />truckfioader <br />0.18 <br />$39 <br />$39 0.18 <br />031d <br />Revegetate pond #2 <br />ravage <br />1.28 <br />$485 <br />$485 1.28 <br />$8,950 <br />$0 $8,950 40.59 <br />Sediment pond #1 <br />037a <br />Backfill pond #1 with topsoil f/ stockpile #8 <br />scraper <br />78.22 <br />$22,416 <br />$22,416 78.22 <br />037b <br />Regrade pond #1 backfill <br />dozer <br />35.63 <br />$7,422 <br />$7,422 35.63 <br />037c <br />Revegetate pond #1 <br />ravage <br />5.80 <br />$2,200 <br />$2,200 5.80 <br />$32,038 <br />$0 $32,038 119.65 <br />$91,690 394.06 <br />$7,534 18.20 <br />$3,912 7.28 <br />$53,642 123.02 <br />Page 1 of 2 <br />