My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-04_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2009-12-04_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:28 PM
Creation date
12/7/2009 10:54:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
REVISION
Doc Date
12/4/2009
Doc Name
Reclamation Cost Estimate (Memo)
From
Jim Stark
To
Dan Mathews
Type & Sequence
SL2
Email Name
DTM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />ON OF RECLAMATION, MINING AND SAFETY <br />nent of Natural Resources <br />313 Sherman St., Room 215 <br />)enver, Colorado 80203 <br />hone: (303) 866-3567 <br />AX: (303) 832-8106 <br />COLORADO <br />D IV IS I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br /> Bill Ritter, Jr. <br />INTEROFFICE Governor <br /> Harris D. Sherman <br />MEMORANDUM Executive Director <br /> Ronald W. Cattany <br /> <br />TO: Dan Mathews Division Director <br /> Natural Resource Trustee <br />FROM: Jim Stark <br />SUBJECT: Yoast Mine's SL-02 Cost Estimate <br />DATE: 4 December 2009 <br />I have completed the reclamation cost estimate for the Yoast Mine's Partial Phase I Bond <br />Release SL-02 application. The estimate is a cost update of all remaining work (not <br />included in the SL-02 application) at the Yoast Mine. Based on this estimate, the new <br />liability at the Yoast Mine is $4,305,484.00. This new liability is $790,205.00 less than <br />the current liability of $5,095,689.00 and $894,516.00 less than the current bond held of <br />$5,200,000.00. Based on this cost estimate review, the Division can release <br />$790,205.00 upon the approval of SL-02. <br />Although the Division will still hold an excess in bond of $104,311.00, this portion of the <br />bond cannot be released since SCC did not request a bond reduction in addition to the <br />bond release in the SL-02 application. The release amount ($790,205.00) is lower than <br />that requested by SCC ($1,365,265.00) due to two factors, as detailed below. Based on <br />the proposed release amount of $790,205.00, the Division would be releasing 15.5% of <br />the Yoast Mine's bond. This amount is well below the allowable 60% for the successful <br />completion of backfilling and grading and drainage reestablishment. <br />The first reason the Division's release amount is lower than that request by SCC is that <br />when the Division determines a releasable amount for a bond release it calculates the <br />cost, in current dollars, to complete all remaining reclamation activities not covered in the <br />bond release application, whether they have been completed on the ground or not (such <br />as road reclamation and topsoil replacement). This recalculation led to cost increases in <br />some areas of the bond. The largest of these increases was in the revegetation costs, <br />which increased from $807,151.00 (in the 2008 Midterm estimate) to $1,025,567.00 in <br />the current estimate. <br />The second reason the Division's releasable amount is less than that requested is because <br />of the exclusion areas, based on the bond release inspection. These exclusion areas <br />Office of Office of <br />ined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.