My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-13_REVISION - C1981033
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981033
>
2009-10-13_REVISION - C1981033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:09 PM
Creation date
10/13/2009 12:25:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Revision
Doc Date
10/13/2009
Doc Name
Map 12A Sections
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
SL4
Email Name
JJD
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EL. 6204 <br />L;'i~. 6200 <br />~ GROUND SURFACE DURING MINING GROUND SURFACE DURING MINING <br /> I <br />i <br />EL. 6100 <br />PROJECTED FINAL GROUNB SUR '?1.. 6100 xROUNB SURFACE <br />PROJECTED FINAL GROUND SURFACE <br /> FINAL GROUND SURFACE <br />FINAL GROUND SURFACE <br />. _ <br />EL. 6000 <br />r~i,. fi000 <br />SECTION A - A <br /> SECTION B - B <br /> GROUND SURFACE DURING MINING <br />GROUND SURFACE DURING MINING <br />~ EL. 6100 <br />t?,L. ~1.QQ <br />PROJECTED FINAL GROUND SURFACE <br /> FINAL GROUND SURFACE <br />EL. 6000 <br />FINAL GROUND SURFACE <br />EL. 6000 <br />SECTION C - C SECTION E - E <br />GROUND SURFACE DURING MINING <br />Notes: LEGEND: <br />1. Final ground surfac GROUND SURFACE DURING MINING Fund surface by Data Mapping from aerial - - - - PROJECTED FINAL GROUND SURFACE <br />i photography dated ~phy dated September 16, 2002. The final FINAL GROUND SURFACE <br />6 i contours r a e shown are shown on Map 17. <br />~ 2. The projected final ~ jected final ground surface is derived from the <br />final contours subm PROJECTED FINAL GROUND SURFACE tours submitted and approved in the permit <br />application packagE ~'on package. The projected final contours are <br />- shown on Map 12. ~n Map 12. <br />FINAL GROUND SURFACE <br />3 The ground surface and surface during mining is derived from the , , r,, <br />contours shown on shown on Map 10. ~ ~ " ~a~~~` boo ale 9 <br /> I hereby certify that thP~~d ~ ~ was ~ <br />Ii;~. 6000 by me or under my ~ sd envision ui that all of the infor~i't~on presented on <br /> drawing is true anc~~~r're t to` the hes~ <br /> my knowledge andA~hel~f~~ fh... <br /> ~~D <br /> 4 c <br />SECTION D - D James E. Stover l~ ~ ~ n~'~ Colorado P.E. 19230 ' <br />BEAR COAL COMPANY <br />BEAR NO. 3 MINE <br />SECTIONS <br />DRAWN BY: J.E.S. REVISED: <br />DATE: 10-07-09 <br />SCALE: 1 "=40' DRAWING: MAP 12A <br />
The URL can be used to link to this page
Your browser does not support the video tag.