2009-05-11_INSPECTION - M1993004
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1993004
>
2009-05-11_INSPECTION - M1993004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:46:21 PM
Creation date
5/12/2009 12:20:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993004
IBM Index Class Name
INSPECTION
Doc Date
5/11/2009
Doc Name
Corrective Action Time Extension
From
Robinson Brick
To
DRMS
Inspection Date
6/9/2008
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROBI NSON RICK <br />A Division of General Shale Brick <br />May 6, 2009 <br />Division of Reclamation, Mining and Safety <br />Colorado Department of Natural Resources <br />1313 Sherman Street. Room 215 <br />Denver, CO 80203 <br />115 <br />Ad. <br />CE <br />SAY '112009 <br />Division Ot Hec:amation, <br />-? Mi,hig and Safety <br />Attention: Mr. Jared Ebert <br />Subject: Robinson Brick Company Navajo Clay Mine (M-1993-004) <br />Stormwater Detention Pond Corrective Action Time Extension <br />Dear Mr. Ebert. <br />On September 22, 2008, Robinson Brick Company committed to construct the <br />stormwater detention pond at the Navajo Mine by April 30. 2009. We requested this <br />extension due to man power constraints and unfortunately the man power constraints <br />worsened during late 2008 and early 2009 as the economy continued to slump. <br />Currently, we are diligently working on constructing the stormwater detention pond dam, <br />which began on April 22, 2009. Once we complete building the dam.. we will excavate <br />the pond behind the dam followed by the construction of the inlet and outlet structures. <br />We anticipate that construction will be completed no later than June 5, 2009. Therefore, <br />we are respectfully requesting an extension of the correction date previously committed <br />in the letter dated September 22, 2008. <br />Please feel free to contact me with any questions or comments at (303) 783-3058. <br />Respectfully, <br />Robinson Brick Company <br />Jason E. McGraw <br />Mine Supervisor <br />1845 West Dartmouth Avenue • Denver, Colorado 80110-1308 <br />Phone: 303-783-3000 • Fax: 303-781-1818 • Toll Free: 800-477-9002 <br />www.robinsonbrick.com